Skip to content

Starting the Aircraft

ph-jake edited this page Mar 28, 2023 · 2 revisions

MANUAL START

See Menu->Help->Aircraft Checklists

NOTE ON STARTING

Starting the engine requires pressure in one or both JFS accumulators. If they are both drained then you must go into Menu->F-16->Configuration and click 'Recharge JFS accumulators' to recharge them if on the ground. If in the air, keep gliding with the EPU on and wait for the accumulators to be charged. Remember the EPU has only hydrazine for 10 minutes of operation if gliding is too slow for significant windmilling.

AUTO START

See Menu->F-16->Configuration Click 'Auto start'

Clone this wiki locally