A POA&M is the auditor-facing record of how and when you will close your gaps.
Evidentia builds POA&M items from a gap-analysis report, lets you attach a
milestone timeline to each, and enforces a forward-only lifecycle so the record
shows genuine progress. This guide walks the full lifecycle with the
evidentia poam commands.
- A gap-analysis report JSON (see Run a gap analysis) —
evidentia poam creatematerializes POA&M items from it.
Each milestone carries a POAMState, a five-member lifecycle enum aligned to the
FedRAMP POA&M Template Completion Guide v3.0 and NIST SP 800-53A Rev 5 Appendix F:
PLANNED ──> IN_PROGRESS ──> COMPLETED ──> VERIFIED
│ │ ▲
└──> OVERDUE <─┘ (auditor sign-off; terminal)
-
planned— scheduled, not started. -
in_progress— actively being worked. -
completed— operator-claimed done, pending auditor verification. -
verified— auditor confirmed; terminal. -
overdue— the off-axis attention state: a planned/in-progress milestone whosetarget_dateis in the past. It is also derived automatically at query time against the current date.
Transitions are forward-only and enforced by the state machine. You cannot
rewind a completed milestone back to in_progress, and verified is terminal.
To re-open work, you file a new milestone with a fresh target date rather than
mutating the verified record — this preserves audit-trail integrity. The
authoritative description lives in
Concepts → Data model.
evidentia poam create --from-gap-report=gap-report.jsonBy default this materializes only critical and high severity gaps — the
auditor-defensible default per FedRAMP POA&M guidance (POA&M items track material
findings; lower-severity gaps are documented in the SSP risk register). Pass
--all to materialize every severity. Existing items are skipped to preserve
milestone history unless you pass --overwrite.
# Materialize every gap, replacing any existing items.
evidentia poam create --from-gap-report=gap-report.json --all --overwriteevidentia poam listBy default list shows only POA&Ms whose underlying gap is open or
in_progress. Add --all to include remediated / accepted items. Filter
with --severity (comma-separated), and — once milestones have owners or
reviewers — with --owner / --reviewer. Add --json for machine-readable
output:
evidentia poam list --severity=critical,high --jsonShow one item in full, including its milestone timeline:
evidentia poam show <poam-id>(<poam-id> is the POA&M's UUID, shown in the first column of poam list.)
evidentia poam milestone add <poam-id> \
--target-date=2026-09-30 \
--description="Enable MFA on all admin accounts"--target-date (ISO-8601 YYYY-MM-DD) and --description (-d) are required.
A new milestone starts at planned unless you pass --status; attach an
evidence pointer with --evidence-ref (a URL, Sigstore bundle path, Jira key,
ServiceNow record, etc.):
evidentia poam milestone add <poam-id> \
--target-date=2026-10-15 \
--description="Verify MFA enforcement via Okta export" \
--status=in_progress \
--evidence-ref="https://jira.example.com/browse/SEC-1234"evidentia poam milestone update <poam-id> <milestone-id> --status=completedThe state machine blocks invalid or backward transitions and tells you so:
Error: invalid state transition completed → in_progress. Backward + invalid
transitions are blocked. To re-open work, file a NEW milestone with a fresh
target_date.
You can also revise a milestone's --target-date, --description, or
--evidence-ref in the same command. (<milestone-id> is the short UUID shown in
poam show.)
Top-level fields (the gap-level status, owner, remediation text, tags) are edited on the item rather than a milestone:
evidentia poam update <poam-id> \
--status=remediated \
--assigned-to=alice@example.com \
--add-tag=q3-prioritySetting --status=remediated stamps a remediated_at timestamp and fires the
POA&M-closed audit event. Auditors generally prefer transitioning status over
deleting; evidentia poam delete <poam-id> exists for records that should never
have existed (a mis-imported gap or a test fixture) and prompts for confirmation
unless you pass -y.
A read-only attention view across all POA&Ms surfaces overdue and due-soon milestones:
evidentia poam calendar --window-days=14Overdue milestones always appear regardless of the window; --window-days
(default 7) controls the "due soon" look-ahead. Use --today=YYYY-MM-DD for
deterministic snapshots in CI, and --json for machine-readable output. For
recurring assessment and reporting cadences, see the
CONMON deployment guide.
Note (verified against the CLI at this release): there is no
evidentia poam/gapsubcommand and no REST endpoint that emits an OSCAL POA&M document. The OSCAL POA&M exporter is a programmatic API:evidentia_core.oscal.poam_exporter.gap_report_to_oscal_poam(report, *, severity_filter=None, embed_back_matter=True). It takes aGapAnalysisReportand returns an OSCALplan-of-action-and-milestonesdocument (defaulting to critical+high gaps, with each item's record embedded as a SHA-256-hashed back-matter resource for chain-of-custody integrity).
import json
from evidentia_core.models.gap import GapAnalysisReport
from evidentia_core.oscal.poam_exporter import gap_report_to_oscal_poam
report = GapAnalysisReport.model_validate_json(
open("gap-report.json", encoding="utf-8").read()
)
oscal_poam = gap_report_to_oscal_poam(report)
with open("poam.oscal.json", "w", encoding="utf-8") as fh:
json.dump(oscal_poam, fh, indent=2, default=str)For an OSCAL Assessment Results document (which the CLI does emit directly),
use evidentia gap analyze --format oscal-ar
(Run a gap analysis).
- The data model behind POA&M: Concepts → Data model.
- Recurring cadences: CONMON deployment.
-
Push gaps to a tracker: the
evidentia integrations jiraandevidentia integrations servicenowverbs in the CLI reference.
- "No POA&M with ID … found": confirm the UUID with
evidentia poam list(the first column shows a truncated ID; pass the full UUID). - "invalid state transition": the lifecycle is forward-only — file a new milestone instead of rewinding a closed one.
-
poam creatematerialized fewer items than expected: by default only critical+high gaps become items; add--all.
-
- AI Governance
- Air Gapped Install
- Ci Integration
- CONMON Deployment
- Emit Cyclonedx VEX
- Emit OCSF Detection
- Emit SARIF
- Explain Controls
- Generate And Quantify Risk
- Governance Metrics And Workflows
- Ingest OCSF
- Manage Model Risk
- Manage POAM
- Manage Third Party Risk
- MCP Client Setup
- OSPS Self Assessment
- Run Gap Analysis
- Serve The Web Ui
- Sign And Verify Evidence