Skip to content

eebox 0.6.2

Choose a tag to compare

@ashevchuk ashevchuk released this 31 Oct 20:29

A fix for the frame of a selected module.

Use it

Fixes

  • The frame of a selected module and the red and amber marks of Check were hidden behind a module that stands against it and is drawn later. They are now drawn after every module, so they show whole.

Limits

  • The frame of a selected cable duct is still drawn before the modules; a module that stands on a duct, which Check reports as an error, can cover it.
  • A long press on a touch screen should open the context menu, as the browser sends the same event; it has not been tried on a device.
  • Wire lengths are estimates from where terminals stand on the panel; the conductor diameters for the duct fill and its 50 % limit are typical values and are not verified.
  • The cable ampacity table was compared with IEC 60364-5-52:2009 (copper, PVC, methods B1, B2, C and E, 1.5 to 35 mm2). Resistivity, reactance, voltage drop limits and trip multiples are not verified; the checks are advice, not a design verification.
  • This is a planning layout, not a manufacturing drawing.
  • File and library formats may still change without migration.