You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
CRW 2.5 is based on Eclipse Che 7.20.x
CRW 2.6 is based on Eclipse Che 7.24.x
CRW 2.7 is based on Eclipse Che 7.26.x
CRW 2.8 is based on Eclipse Che 7.28.x
che-bot
added
the
status/need-triage
An issue that needs to be prioritized by the curator responsible for the triage. See https://github.
label
Feb 25, 2021
tolusha
added
kind/planning
A checklist of issues for planning a particular sprint.
and removed
kind/task
Internal things, technical debt, and to-do tasks to be performed.
status/need-triage
An issue that needs to be prioritized by the curator responsible for the triage. See https://github.
labels
Feb 25, 2021
Timeframe
Mar. 3 - Mar. 23
Team
Holidays / events:
CRW releases
CRW 2.5 is based on Eclipse Che 7.20.x
CRW 2.6 is based on Eclipse Che 7.24.x
CRW 2.7 is based on Eclipse Che 7.26.x
CRW 2.8 is based on Eclipse Che 7.28.x
CRW issues
Eclipse Che issues
eclipse
organization occurrence oneclipse-che
che-operator#727Unplanned
Previous Sprint
The text was updated successfully, but these errors were encountered: