Two sequential edges are be converted to one by converting the node into a geometry point. After using the context option in my example, the joined edge is displayed in Netedit (1_2_0+0830). But after recomputing the network, only the previous upstream part is saved and the downstream part is discarded.
Try node gneJ190 in the attached example:
TT_VV_test.net.xml.zip
Two sequential edges are be converted to one by converting the node into a geometry point. After using the context option in my example, the joined edge is displayed in Netedit (1_2_0+0830). But after recomputing the network, only the previous upstream part is saved and the downstream part is discarded.
Try node gneJ190 in the attached example:
TT_VV_test.net.xml.zip