Skip to content

Conversation

@renovate
Copy link

@renovate renovate bot commented Aug 15, 2020

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • requirements.txt (pip_requirements)
  • Pipfile (pipenv)
  • pyproject.toml (poetry)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 open PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


What to Expect

With your current configuration, Renovate will create 75 Pull Requests:

Update dependency GitPython to v2.1.15
  • Schedule: ["at any time"]
  • Branch name: renovate/gitpython-2.x
  • Merge into: master
  • Upgrade GitPython to ==2.1.15
Update dependency Jinja2 to v2.11.2
  • Schedule: ["at any time"]
  • Branch name: renovate/jinja2-2.x
  • Merge into: master
  • Upgrade Jinja2 to ==2.11.2
Update dependency Pygments to v2.6.1
  • Schedule: ["at any time"]
  • Branch name: renovate/pygments-2.x
  • Merge into: master
  • Upgrade Pygments to ==2.6.1
Update dependency attrs to v19.3.0
  • Schedule: ["at any time"]
  • Branch name: renovate/attrs-19.x
  • Merge into: master
  • Upgrade attrs to ==19.3.0
Update dependency autopep8 to v1.5.4
  • Schedule: ["at any time"]
  • Branch name: renovate/autopep8-1.x
  • Merge into: master
  • Upgrade autopep8 to ==1.5.4
Update dependency bleach to v3.1.5
  • Schedule: ["at any time"]
  • Branch name: renovate/bleach-3.x
  • Merge into: master
  • Upgrade bleach to ==3.1.5
Update dependency certifi to v2019.11.28
  • Schedule: ["at any time"]
  • Branch name: renovate/certifi-2019.x
  • Merge into: master
  • Upgrade certifi to ==2019.11.28
Update dependency configparser to v3.8.1
  • Schedule: ["at any time"]
  • Branch name: renovate/configparser-3.x
  • Merge into: master
  • Upgrade configparser to ==3.8.1
Update dependency decorator to v4.4.2
  • Schedule: ["at any time"]
  • Branch name: renovate/decorator-4.x
  • Merge into: master
  • Upgrade decorator to ==4.4.2
Update dependency defusedxml to v0.6.0
  • Schedule: ["at any time"]
  • Branch name: renovate/defusedxml-0.x
  • Merge into: master
  • Upgrade defusedxml to ==0.6.0
Update dependency enum34 to v1.1.10
  • Schedule: ["at any time"]
  • Branch name: renovate/enum34-1.x
  • Merge into: master
  • Upgrade enum34 to ==1.1.10
Update dependency future to v0.18.2
  • Schedule: ["at any time"]
  • Branch name: renovate/future-0.x
  • Merge into: master
  • Upgrade future to ==0.18.2
Update dependency futures to v3.3.0
  • Schedule: ["at any time"]
  • Branch name: renovate/futures-3.x
  • Merge into: master
  • Upgrade futures to ==3.3.0
Update dependency idna to v2.10
  • Schedule: ["at any time"]
  • Branch name: renovate/idna-2.x
  • Merge into: master
  • Upgrade idna to ==2.10
Update dependency ipaddress to v1.0.23
  • Schedule: ["at any time"]
  • Branch name: renovate/ipaddress-1.x
  • Merge into: master
  • Upgrade ipaddress to ==1.0.23
Update dependency ipykernel to v4.10.1
  • Schedule: ["at any time"]
  • Branch name: renovate/ipykernel-4.x
  • Merge into: master
  • Upgrade ipykernel to ==4.10.1
Update dependency ipython to v5.10.0
  • Schedule: ["at any time"]
  • Branch name: renovate/ipython-5.x
  • Merge into: master
  • Upgrade ipython to ==5.10.0
Update dependency jedi to v0.17.2
  • Schedule: ["at any time"]
  • Branch name: renovate/jedi-0.x
  • Merge into: master
  • Upgrade jedi to ==0.17.2
Update dependency jsonschema to v3.2.0
  • Schedule: ["at any time"]
  • Branch name: renovate/jsonschema-3.x
  • Merge into: master
  • Upgrade jsonschema to ==3.2.0
Update dependency jupyter-client to v5.3.5
  • Schedule: ["at any time"]
  • Branch name: renovate/jupyter-client-5.x
  • Merge into: master
  • Upgrade jupyter-client to ==5.3.5
Update dependency jupyter-core to v4.6.3
  • Schedule: ["at any time"]
  • Branch name: renovate/jupyter-core-4.x
  • Merge into: master
  • Upgrade jupyter-core to ==4.6.3
Update dependency jupyterlab-git to v0.20.0
  • Schedule: ["at any time"]
  • Branch name: renovate/jupyterlab-git-0.x
  • Merge into: master
  • Upgrade jupyterlab-git to ==0.20.0
Update dependency lazy-object-proxy to v1.5.1
  • Schedule: ["at any time"]
  • Branch name: renovate/lazy-object-proxy-1.x
  • Merge into: master
  • Upgrade lazy-object-proxy to ==1.5.1
Update dependency nbconvert to v5.6.1
  • Schedule: ["at any time"]
  • Branch name: renovate/nbconvert-5.x
  • Merge into: master
  • Upgrade nbconvert to ==5.6.1
Update dependency nbresuse to v0.3.6
  • Schedule: ["at any time"]
  • Branch name: renovate/nbresuse-0.x
  • Merge into: master
  • Upgrade nbresuse to ==0.3.6
Update dependency nose2 to v0.9.2
  • Schedule: ["at any time"]
  • Branch name: renovate/nose2-0.x
  • Merge into: master
  • Upgrade nose2 to ==0.9.2
Update dependency notebook to v5.7.10
  • Schedule: ["at any time"]
  • Branch name: renovate/notebook-5.x
  • Merge into: master
  • Upgrade notebook to ==5.7.10
Update dependency parso to v0.8.0
  • Schedule: ["at any time"]
  • Branch name: renovate/parso-0.x
  • Merge into: master
  • Upgrade parso to ==0.8.0
Update dependency pathlib2 to v2.3.5
  • Schedule: ["at any time"]
  • Branch name: renovate/pathlib2-2.x
  • Merge into: master
  • Upgrade pathlib2 to ==2.3.5
Update dependency pbr to v5.4.5
  • Schedule: ["at any time"]
  • Branch name: renovate/pbr-5.x
  • Merge into: master
  • Upgrade pbr to ==5.4.5
Update dependency pexpect to v4.8.0
  • Schedule: ["at any time"]
  • Branch name: renovate/pexpect-4.x
  • Merge into: master
  • Upgrade pexpect to ==4.8.0
Update dependency pluggy to v0.13.1
  • Schedule: ["at any time"]
  • Branch name: renovate/pluggy-0.x
  • Merge into: master
  • Upgrade pluggy to ==0.13.1
Update dependency prometheus-client to v0.8.0
  • Schedule: ["at any time"]
  • Branch name: renovate/prometheus-client-0.x
  • Merge into: master
  • Upgrade prometheus-client to ==0.8.0
Update dependency prompt-toolkit to v1.0.18
  • Schedule: ["at any time"]
  • Branch name: renovate/prompt-toolkit-1.x
  • Merge into: master
  • Upgrade prompt-toolkit to ==1.0.18
Update dependency psutil to v5.7.2
  • Schedule: ["at any time"]
  • Branch name: renovate/psutil-5.x
  • Merge into: master
  • Upgrade psutil to ==5.7.2
Update dependency pycodestyle to v2.6.0
  • Schedule: ["at any time"]
  • Branch name: renovate/pycodestyle-2.x
  • Merge into: master
  • Upgrade pycodestyle to ==2.6.0
Update dependency pyflakes to v2.2.0
  • Schedule: ["at any time"]
  • Branch name: renovate/pyflakes-2.x
  • Merge into: master
  • Upgrade pyflakes to ==2.2.0
Update dependency pyrsistent to v0.16.0
  • Schedule: ["at any time"]
  • Branch name: renovate/pyrsistent-0.x
  • Merge into: master
  • Upgrade pyrsistent to ==0.16.0
Update dependency python-dateutil to v2.8.1
  • Schedule: ["at any time"]
  • Branch name: renovate/python-dateutil-2.x
  • Merge into: master
  • Upgrade python-dateutil to ==2.8.1
Update dependency python-jsonrpc-server to v0.3.4
  • Schedule: ["at any time"]
  • Branch name: renovate/python-jsonrpc-server-0.x
  • Merge into: master
  • Upgrade python-jsonrpc-server to ==0.3.4
Update dependency python-language-server to v0.34.1
  • Schedule: ["at any time"]
  • Branch name: renovate/python-language-server-0.x
  • Merge into: master
  • Upgrade python-language-server to ==0.34.1
Update dependency pyzmq to v18.1.1
  • Schedule: ["at any time"]
  • Branch name: renovate/pyzmq-18.x
  • Merge into: master
  • Upgrade pyzmq to ==18.1.1
Update dependency regex to v2019.12.20
  • Schedule: ["at any time"]
  • Branch name: renovate/regex-2019.x
  • Merge into: master
  • Upgrade regex to ==2019.12.20
Update dependency requests to v2.24.0
  • Schedule: ["at any time"]
  • Branch name: renovate/requests-2.x
  • Merge into: master
  • Upgrade requests to ==2.24.0
Update dependency rope to v0.17.0
  • Schedule: ["at any time"]
  • Branch name: renovate/rope-0.x
  • Merge into: master
  • Upgrade rope to ==0.17.0
Update dependency six to v1.15.0
  • Schedule: ["at any time"]
  • Branch name: renovate/six-1.x
  • Merge into: master
  • Upgrade six to ==1.15.0
Update dependency snowballstemmer to v1.9.1
  • Schedule: ["at any time"]
  • Branch name: renovate/snowballstemmer-1.x
  • Merge into: master
  • Upgrade snowballstemmer to ==1.9.1
Update dependency terminado to v0.8.3
  • Schedule: ["at any time"]
  • Branch name: renovate/terminado-0.x
  • Merge into: master
  • Upgrade terminado to ==0.8.3
Update dependency testpath to v0.4.4
  • Schedule: ["at any time"]
  • Branch name: renovate/testpath-0.x
  • Merge into: master
  • Upgrade testpath to ==0.4.4
Update dependency traitlets to v4.3.3
  • Schedule: ["at any time"]
  • Branch name: renovate/traitlets-4.x
  • Merge into: master
  • Upgrade traitlets to ==4.3.3
Update dependency urllib3 to v1.25.10
  • Schedule: ["at any time"]
  • Branch name: renovate/urllib3-1.x
  • Merge into: master
  • Upgrade urllib3 to ==1.25.10
Update dependency wcwidth to v0.2.5
  • Schedule: ["at any time"]
  • Branch name: renovate/wcwidth-0.x
  • Merge into: master
  • Upgrade wcwidth to ==0.2.5
Update dependency yapf to v0.30.0
  • Schedule: ["at any time"]
  • Branch name: renovate/yapf-0.x
  • Merge into: master
  • Upgrade yapf to ==0.30.0
Update dependency GitPython to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/gitpython-3.x
  • Merge into: master
  • Upgrade GitPython to ==3.1.7
Update dependency astroid to v2
  • Schedule: ["at any time"]
  • Branch name: renovate/astroid-2.x
  • Merge into: master
  • Upgrade astroid to ==2.4.2
Update dependency certifi to v2020
  • Schedule: ["at any time"]
  • Branch name: renovate/certifi-2020.x
  • Merge into: master
  • Upgrade certifi to ==2020.6.20
Update dependency configparser to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/configparser-5.x
  • Merge into: master
  • Upgrade configparser to ==5.0.0
Update dependency coverage to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/coverage-5.x
  • Merge into: master
  • Upgrade coverage to ==5.2.1
Update dependency devstack-tools to v1
  • Schedule: ["at any time"]
  • Branch name: renovate/devstack-tools-1.x
  • Merge into: master
  • Upgrade devstack-tools to ==1.0.0
Update dependency gitdb2 to v4
  • Schedule: ["at any time"]
  • Branch name: renovate/gitdb2-4.x
  • Merge into: master
  • Upgrade gitdb2 to ==4.0.2
Update dependency ipykernel to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/ipykernel-5.x
  • Merge into: master
  • Upgrade ipykernel to ==5.3.4
Update dependency ipython to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/ipython-7.x
  • Merge into: master
  • Upgrade ipython to ==7.17.0
Update dependency isort to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/isort-5.x
  • Merge into: master
  • Upgrade isort to ==5.4.2
Update dependency jupyter-client to v6
  • Schedule: ["at any time"]
  • Branch name: renovate/jupyter-client-6.x
  • Merge into: master
  • Upgrade jupyter-client to ==6.1.6
Update dependency mock to v4
  • Schedule: ["at any time"]
  • Branch name: renovate/mock-4.x
  • Merge into: master
  • Upgrade mock to ==4.0.2
Update dependency nbformat to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/nbformat-5.x
  • Merge into: master
  • Upgrade nbformat to ==5.0.7
Update dependency notebook to v6
  • Schedule: ["at any time"]
  • Branch name: renovate/notebook-6.x
  • Merge into: master
  • Upgrade notebook to ==6.1.3
Update dependency prompt-toolkit to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/prompt-toolkit-3.x
  • Merge into: master
  • Upgrade prompt-toolkit to ==3.0.6
Update dependency pydocstyle to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/pydocstyle-5.x
  • Merge into: master
  • Upgrade pydocstyle to ==5.0.2
Update dependency pylint to v2
  • Schedule: ["at any time"]
  • Branch name: renovate/pylint-2.x
  • Merge into: master
  • Upgrade pylint to ==2.5.3
Update dependency pyzmq to v19
  • Schedule: ["at any time"]
  • Branch name: renovate/pyzmq-19.x
  • Merge into: master
  • Upgrade pyzmq to ==19.0.2
Update dependency regex to v2020
  • Schedule: ["at any time"]
  • Branch name: renovate/regex-2020.x
  • Merge into: master
  • Upgrade regex to ==2020.7.14
Update dependency smmap2 to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/smmap2-3.x
  • Merge into: master
  • Upgrade smmap2 to ==3.0.1
Update dependency snowballstemmer to v2
  • Schedule: ["at any time"]
  • Branch name: renovate/snowballstemmer-2.x
  • Merge into: master
  • Upgrade snowballstemmer to ==2.0.0
Update dependency tornado to v6
  • Schedule: ["at any time"]
  • Branch name: renovate/tornado-6.x
  • Merge into: master
  • Upgrade tornado to ==6.0.4

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR has been generated by WhiteSource Renovate. View repository job log here.

@toddbirchard toddbirchard merged commit 3f6a3d7 into master Aug 18, 2020
@toddbirchard toddbirchard deleted the renovate/configure branch August 18, 2020 01:05
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants