Repository navigation
Manufacturing and Inventory
Home › Using Granary › Buy and make › Manufacturing and Inventory
On this page: AI in this module · Find your way around · Products and bills of materials · Production orders · Unit registry · Quality control · Inventory · Warehouses · Stock movements · Warranty and RMA · Settings that affect this module · Permissions
The Manufacturing and Inventory module is for companies that build, assemble or stock physical products. You define products and their bills of materials (BOMs), run production orders that reserve and consume components, inspect finished units, give every unit a serial number and follow it to the customer, and handle warranty claims and returns (RMA). Inventory keeps component stock levels, warehouses with their storage locations, and every stock movement. Production staff, warehouse staff and after-sales support use it.

Nary has no manufacturing or inventory tools yet: it can't read or change bills of materials, production, stock or warranty records. In the chat it can explain how this module works, from the ERP guide built into Granary. See AI Across Granary for what the AI does in the other modules. (Nary does read and, on the Owner's card, change the sales catalog: see Sales.)
Open Manufacturing in the sidebar. It has these pages:
| Page | What it is for |
|---|---|
| Products / BOMs | The products you make, and the bill of materials for each |
| Production Orders | Manufacturing runs, from planning to completion |
| Unit Registry | Every unit by serial number, from production to the customer |
| QC Records | Inspection records for units |
| Inventory | Component stock, reorder points and adjustments |
| Warranty / RMA | Warranties for shipped units and return cases |
| Warehouses | Warehouses and their locations (zone, aisle, rack, bin) |
| Stock Movements | Receipts, issues, transfers and adjustments of stock |
- Open Manufacturing > Products / BOMs and click New product.
- Enter the Product code (for example
KT-DESK-01) and the Name (for example "Standing desk frame"). - Pick the Category: Finished good, Assembly, Peripheral, Component or Other.
- Optional: the Product line (from R&D), a Description, the Unit cost and its Currency.
- Enter a Serial prefix of 2 to 6 letters, for example
KTD. Granary uses it to generate the serial of every unit of this product. - Click Create product.
You can change a product's line from the list with the Set line... picker. The tabs are All products, Active and Inactive.

- On the product's row, click BOM.
- For each component, enter the Component name, the SKU, the Quantity and the Unit (for example
pcs). Click Add component for more. - Click Save BOM.
Each component needs a name and a quantity. A new BOM is a draft and goes to its approval chain (see Approvals and Signing). Production uses only an approved BOM. The product's details show its BOM: the latest approved version, or the newest one while none is approved.
Use the component SKUs that you track in Inventory, so production can reserve and consume them.
- Open Manufacturing > Production Orders and click New order.
- Pick the Product. Its BOM is selected for you in Bill of materials.
- Enter the Quantity, the Due date and optional Notes.
- Click Create order. It starts as Planned.
Each row has a button for the next step:
| Status | What happens when you move to it |
|---|---|
| Planned | The order is created |
| Component check | You check that the components are there |
| In production | Granary reserves the components the BOM needs for the quantity. A BOM must be linked |
| QC | The units are inspected |
| Completed | Granary consumes the reserved components and books the finished goods into stock |
An order can go back from Component check to Planned, and from QC to In production. It can be cancelled at any step before completion; cancelling or going back to Planned releases the reserved components.
Completing fails with "Not enough components on hand to complete" when stock is short. Record the missing stock first (see Stock movements).
Click Cost on a row to enter the actual material cost; the list shows it next to the BOM cost. Only planned or cancelled orders can be deleted. The tabs are All orders, Planned, In production, QC and Completed.
Every unit you build gets its own serial number, so you can follow it through production, QC, stock and shipping, and find it again for warranty claims.
- Open Manufacturing > Unit Registry and click Register unit.
- Pick the Production order and the Product.
- Optional: the Hardware revision (for example
v1.2) and Notes. - Turn on Test unit for a unit that will never go to a customer.
- Click Register unit.
Granary generates the serial from the product's serial prefix, for example KTD-7K2M9-QXH48. A test unit's
serial has a T after the prefix (for example KTDT-...). The Unit registered box shows the serial with a
copy button: write it on the unit's label.
The last character of a generated serial is a check character. When you search, case, dashes and spaces don't
matter, and I/L are read as 1 and O as 0. A mistyped serial is caught: "This serial's check
character does not match: probably a typo".
Open a unit's details and use the Move to: buttons:
| From | Can move to |
|---|---|
| In production | QC pending |
| QC pending | QC passed, QC failed |
| QC failed | Rework, QC pending |
| Rework | QC pending |
| QC passed | In stock |
| In stock | Reserved, Shipped |
| Reserved | Shipped, In stock |
| Shipped | Returned |
Logging an inspection (see Quality control) sets QC passed or QC failed for you.
When a unit leaves for the customer, move it to Shipped. The unit's details show the Delivery date, the Tracking no. and the Warranty expiry when they are recorded. Then register its warranty (see Warranty and RMA).
The tabs are All units, In production, QC pending, In stock and Shipped. You can filter by product and search by serial.

- Open Manufacturing > QC Records and click Log inspection.
- Pick the Unit by its serial.
- Work through the Checklist. It starts with Power on test, Function test, Burn-in test and Enclosure & cosmetics. Mark each check, or type a New check and click Add.
- Choose the Overall result: Pass, Fail or Passed with conditions.
- For Passed with conditions, write the conditions (what must be true for this unit to be used). They are required, and the unit counts as passed.
- Click Log inspection.
A pass moves the unit to QC passed, a fail to QC failed. The tiles show the total, passes, fails and the pass rate. The tabs are All, Pass, Fail and Conditional.
Manufacturing > Inventory holds the stock of components (and other items you track by SKU).
- Click Add component.
- Enter the Name, the SKU, the Qty on hand, the Reorder point and the Unit.
- Optional: the Category, Unit cost and Currency, Location and Supplier.
- Click Add component.
A SKU can exist only once. The Low stock tab lists items at or below their reorder point. The tiles show the number of components, low-stock items, total SKUs and the stock value.
- On the item's row, click Adjust.
- Enter the Adjustment (+/-), for example
+50or-10, and a Reason. - Click Apply adjustment.
An adjustment that would make the stock negative is refused.
Stock also changes on its own: goods receipts add to it (see Procurement), production orders reserve and consume it, and completed orders add finished goods.

- Open Manufacturing > Warehouses and click New warehouse.
- Enter the Name (for example "Tokyo Main Warehouse"), the Code (for example
WH01) and the Address. - Tick Set as default warehouse if it is your main one.
- Click Create warehouse.
A warehouse can be deactivated, except the default warehouse.
Locations follow a hierarchy: zone > aisle > rack > bin.
- Select the warehouse and click Add location.
- Enter the Name (for example "Zone A") and the Code (for example
ZA). - Pick the Type: Zone (top-level area), Aisle, Rack or Bin (storage unit).
- Optional: pick the Parent location. Leave it empty for a top-level location.
- Click Add location.
Manufacturing > Stock Movements is the log of every movement, and where you record one by hand.
- Click Record move.
- Pick the Movement type:
- Receipt (stock in): stock arrives at a location;
- Issue (stock out): stock leaves a location;
- Internal transfer (location to location): stock moves between two locations;
- Adjustment (manual correction).
- Enter the Component SKU and the Quantity. The Component name fills in from inventory when you leave it empty.
- Pick the From location and/or the To location. A transfer needs both.
- Add a Reference (for example a PO or work order number) and Notes.
- Click Record move.
The quantity must be above zero (an adjustment can't be zero). A move or transfer that would take more than is on hand is refused. A transfer is recorded as two lines, one out and one in.
The tabs are All moves, Receipts, Issues, Transfers and Adjustments; you can filter by SKU.

- Open Manufacturing > Warranty / RMA and click Register warranty.
- Enter the unit's Serial number (the unit must be in the unit registry) and pick the Product.
- Enter the Customer name and Customer email, the Purchase date and the Warranty expiry.
- Click Register.
Active warranties that end within 30 days are marked Expiring soon.
- On the warranty's row, click Open RMA.
- Describe the problem in Issue description and click Open RMA. Granary creates an RMA case with its own number.
- When the case is resolved, click Close RMA.
The tabs are All, Active, RMA open, RMA closed and Expired.
Open Settings > General, then Operations > Manufacturing.
| Setting | Key | What it does |
|---|---|---|
| Serial generation tries | manufacturing.serial.generate_tries |
How many times Granary draws a new serial when a generated one is already taken (rare) |
Approval chains for BOMs are set under Approvals & signing; see Approvals and Signing. The over-delivery tolerance on goods receipts is a procurement setting; see Procurement.
| Permission | Allows |
|---|---|
manufacturing:view_products |
See products, BOMs, production orders, units, QC records and warranties |
manufacturing:manage_bom |
Create and change products and their BOMs |
manufacturing:create_production_order |
Create production orders |
manufacturing:manage_production |
Move production orders, set their cost, delete them; register and move units |
manufacturing:log_qc |
Log QC inspections |
manufacturing:view_inventory |
See component inventory |
manufacturing:manage_inventory |
Add components and adjust stock |
manufacturing:manage_warranty |
Register warranties, open and close RMAs |
inventory:view |
See warehouses, locations and stock movements |
inventory:manage |
Create and change warehouses and locations, record stock movements and transfers |
Portal users never reach this module. Superadmins can do everything.
- Procurement: purchase orders and goods receipts that bring components in
- R&D: product lines
- Approvals and Signing: BOM approval
- Sales: the product catalog you sell from
- Operations: equipment maintenance for your production machines
← Previous: Procurement | Next: Operations →
Getting started
AI in Granary
Using Granary
- Sell
- Approve and sign
- Money
- Buy and make
- People
- Work together
Administration
Developers