Skip to content

Conversation

@rajaSahil
Copy link
Contributor

@rajaSahil rajaSahil commented Sep 17, 2025

What this PR does / why we need it:
update rockylinux and rhel image for e2e tests

Which issue(s) this PR fixes:

Fixes kubermatic/kubermatic#12366 kubermatic/kubermatic#12367

What type of PR is this?

/kind chore

Special notes for your reviewer:

Does this PR introduce a user-facing change? Then add your Release Note here:

NONE

Documentation:

NONE

Signed-off-by: rajaSahil <sahilraja242@gmail.com>
@kubermatic-bot kubermatic-bot added release-note-none Denotes a PR that doesn't merit a release note. kind/chore Updating grunt tasks etc; no production code changes. docs/none Denotes a PR that doesn't need documentation (changes). dco-signoff: yes Denotes that all commits in the pull request have the valid DCO signoff message. sig/cluster-management Denotes a PR or issue as being assigned to SIG Cluster Management. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. labels Sep 17, 2025
Copy link
Member

@kron4eg kron4eg left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve

@kubermatic-bot kubermatic-bot added lgtm Indicates that a PR is ready to be merged. approved Indicates a PR has been approved by an approver from all required OWNERS files. labels Sep 17, 2025
@ahmedwaleedmalik
Copy link
Member

ahmedwaleedmalik commented Sep 17, 2025

/hold (since we are updating images it's necessary to run the corresponding e2e tests as well)

@kubermatic-bot kubermatic-bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Sep 17, 2025
@ahmedwaleedmalik
Copy link
Member

/test pull-machine-controller-e2e-kubevirt pull-machine-controller-e2e-openstack pull-machine-controller-e2e-vsphere

@kubermatic-bot kubermatic-bot removed the lgtm Indicates that a PR is ready to be merged. label Sep 17, 2025
@rajaSahil
Copy link
Contributor Author

/retest

Signed-off-by: rajaSahil <sahilraja242@gmail.com>
@kubermatic-bot kubermatic-bot added size/S Denotes a PR that changes 10-29 lines, ignoring generated files. and removed size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. labels Sep 17, 2025
@rajaSahil
Copy link
Contributor Author

/test pull-machine-controller-e2e-kubevirt

Signed-off-by: rajaSahil <sahilraja242@gmail.com>
@rajaSahil
Copy link
Contributor Author

/test pull-machine-controller-e2e-kubevirt pull-machine-controller-e2e-vsphere

Copy link
Member

@ahmedwaleedmalik ahmedwaleedmalik left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve

Thanks for the great work @rajaSahil

@kubermatic-bot kubermatic-bot added the lgtm Indicates that a PR is ready to be merged. label Sep 17, 2025
@kubermatic-bot
Copy link
Contributor

LGTM label has been added.

Git tree hash: 4ef57ab92bfeb0763de8bf51259bdd7061212322

@ahmedwaleedmalik
Copy link
Member

/unhold

@kubermatic-bot kubermatic-bot removed the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Sep 17, 2025
Copy link
Member

@kron4eg kron4eg left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve

@kubermatic-bot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: ahmedwaleedmalik, kron4eg

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:
  • OWNERS [ahmedwaleedmalik,kron4eg]

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

This was linked to issues Sep 17, 2025
@kubermatic-bot kubermatic-bot merged commit ad427b2 into kubermatic:main Sep 17, 2025
14 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. dco-signoff: yes Denotes that all commits in the pull request have the valid DCO signoff message. docs/none Denotes a PR that doesn't need documentation (changes). kind/chore Updating grunt tasks etc; no production code changes. lgtm Indicates that a PR is ready to be merged. release-note-none Denotes a PR that doesn't merit a release note. sig/cluster-management Denotes a PR or issue as being assigned to SIG Cluster Management. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Support Rocky Linux 9 as OS Support RHEL 9 as OS Support for RHEL 9 as OS

4 participants