Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
1 change: 0 additions & 1 deletion modules/ROOT/content-nav.adoc
Original file line number Diff line number Diff line change
Expand Up @@ -129,7 +129,6 @@ Generic Start
* *Tutorials*
* Upgrade and migration
** xref:tutorials/migration-free.adoc[]
** xref:tutorials/upgrade-auradb-professional-to-auradb-business-critical.adoc[]
* Integrating with Neo4j Connectors
** xref:tutorials/spark.adoc[]
** xref:tutorials/bi.adoc[]
Expand Down
17 changes: 17 additions & 0 deletions modules/ROOT/pages/managing-instances/instance-actions.adoc
Original file line number Diff line number Diff line change
Expand Up @@ -200,3 +200,20 @@ image::mark-as-production.png[]
[.shadow]
.Instance marked as production
image::marked-as-production.png[]

== Upgrade AuraDB Professional to AuraDB Business Critical

To upgrade your AuraDB Professional instance to AuraDB Business Critical, select the more menu (*…​*) on an instance card, then select *Upgrade*.

.Upgrade your AuraDB Professional instance to AuraDB Business Critical
[.shadow]
image::upgradeprotobc.png[]

This upgrade does not change the original DBID, so your application strings remain valid.

*GDS plugin removal:*
If your AuraDB Professional instance uses the GDS plugin, it is removed during the upgrade.
The GDS plugin is not supported in AuraDB Business Critical.

*Minimum instance size:*
If you try to upgrade a 1GB Professional instance, you need to resize it to at least 2GB of storage, because this is the minimum supported size in AuraDB Business Critical.

This file was deleted.