Repository navigation
2026 W29
Generated scaffold:
npm run report:weekly. Numbers are machine-derived; narrative is founder-written. Every number on this page comes from a real row. Zeros stay zeros.
| Metric | This week | vs prev | vs baseline |
|---|---|---|---|
| Attendance: active teachers | 0 | — | — |
| Attendance: rows written | 0 | — | — |
| Attendance: class-days marked | 0 | — | — |
| Fees: active staff | 0 | — | — |
| Fees: rows created | 0 | — | — |
| Accounts (users/teachers/students) | 14 / 0 / 3 | — | — |
This is the baseline week. Thresholds activate from next week's run.
-
Thu 16 Jul (multi-agent build day): all three build-lane fixes done in parallel worktree agents and merged to
w29-build-merge— fabricated WhatsApp toast removed (#335), NULL school_code fail-closed fix + regression suite (#336), attendance_view/report_view usage events wired and proven with real rows (#337). 429 unit tests + 17 e2e green on the merged branch. Awaiting one push to deploy. One-page paid-pilot offer drafted and print-ready (docs/dashboard/pilot-offer.md/.pdf). Dev infrastructure: Windows box "wednesday" is now a remote dev server (SSH + docker context over direct Ethernet); per-projectdevdbanddpullhelpers; e2e now runs against a real dev DB. Discovered home ISP crawling at ~1Mbps (both machines) — check ACT. S1 (principal call) slipped to Friday morning. -
Founding thesis written, adversarially reviewed (office-hours → CEO review → full /autoplan pipeline: 3 Codex passes + 3 independent Claude reviews), and gate-approved. Plan of record lives in
~/.gstack/projects/NitishKumar-ai-Class-mode/. -
Dashboard, weekly-report engine (
npm run report:weekly), operating rhythm doc, and programs pipeline shipped (this commit) — objective 3's metrics precondition is 80% done (view-event wiring + Gemini billing remain, due day 14 = Jul 29). -
Two live prod bugs found by review and queued as fix tasks: fabricated "parents notified on WhatsApp" toast; NULL school_code on admin attendance writes.
- The baseline is zero. No attendance rows, no fee entries, no feature_usage events this week. 14 accounts exist (0 teachers, 3 students). Nothing in prod is being used organically right now — the plan's no-traction branch (re-onboarding experiment, 2-week traction bar) should be assumed active pending the on-ground audit.
- Known probe history: two AI-generation outages produced zero user complaints. Consistent with the zeros above.
- None this week yet. The WTP visit (audit → term report + paid-pilot offer → ask) is the week's remaining must-do; first attempt due before Friday Jul 17, reschedule-within-week rule applies.
- TD1: pilot school language not named — blocks the vernacular pass locale/script/font decisions.
-
Day-14 preconditions (Jul 29): view-event wiring done 16 Jul (pending deploy with
w29-build-merge); Gemini billing link remains (needs a payment method) — confirmed still broken 16 Jul (API key rejected in dev logs). - Zero-teachers-in-prod means the wedge audit may reveal onboarding, not features, as the first problem. Eyes open.
- The school visit: workflow audit + WTP close attempt with offer sheet (objective 1).
- Honesty fixes (WhatsApp toast, school_code bug) + view-event wiring shipped and verified.
- Founders Hub application submitted (pays the Azure bill); start entity/DPIIT paperwork.
School-facing 0% · Build 30% · Ops 70% (planning-heavy founding week — acceptable once, flagged per the rule that build-only weeks get called out)