Skip to content

2026 W29

github-actions[bot] edited this page Jul 20, 2026 · 1 revision

Weekly Report — 2026-W29

Generated scaffold: npm run report:weekly. Numbers are machine-derived; narrative is founder-written. Every number on this page comes from a real row. Zeros stay zeros.

Metrics (auto-generated)

Weekly metrics — 2026-W29 (2026-07-13 → 2026-07-20, exclusive)

Metric This week vs prev vs baseline
Attendance: active teachers 0 — —
Attendance: rows written 0 — —
Attendance: class-days marked 0 — —
Fees: active staff 0 — —
Fees: rows created 0 — —
Accounts (users/teachers/students) 14 / 0 / 3 — —

This is the baseline week. Thresholds activate from next week's run.

Progress this week

  • Thu 16 Jul (multi-agent build day): all three build-lane fixes done in parallel worktree agents and merged to w29-build-merge — fabricated WhatsApp toast removed (#335), NULL school_code fail-closed fix + regression suite (#336), attendance_view/report_view usage events wired and proven with real rows (#337). 429 unit tests + 17 e2e green on the merged branch. Awaiting one push to deploy. One-page paid-pilot offer drafted and print-ready (docs/dashboard/pilot-offer.md/.pdf). Dev infrastructure: Windows box "wednesday" is now a remote dev server (SSH + docker context over direct Ethernet); per-project devdb and dpull helpers; e2e now runs against a real dev DB. Discovered home ISP crawling at ~1Mbps (both machines) — check ACT. S1 (principal call) slipped to Friday morning.

  • Founding thesis written, adversarially reviewed (office-hours → CEO review → full /autoplan pipeline: 3 Codex passes + 3 independent Claude reviews), and gate-approved. Plan of record lives in ~/.gstack/projects/NitishKumar-ai-Class-mode/.

  • Dashboard, weekly-report engine (npm run report:weekly), operating rhythm doc, and programs pipeline shipped (this commit) — objective 3's metrics precondition is 80% done (view-event wiring + Gemini billing remain, due day 14 = Jul 29).

  • Two live prod bugs found by review and queued as fix tasks: fabricated "parents notified on WhatsApp" toast; NULL school_code on admin attendance writes.

Feature behavior

  • The baseline is zero. No attendance rows, no fee entries, no feature_usage events this week. 14 accounts exist (0 teachers, 3 students). Nothing in prod is being used organically right now — the plan's no-traction branch (re-onboarding experiment, 2-week traction bar) should be assumed active pending the on-ground audit.
  • Known probe history: two AI-generation outages produced zero user complaints. Consistent with the zeros above.

School-facing

  • None this week yet. The WTP visit (audit → term report + paid-pilot offer → ask) is the week's remaining must-do; first attempt due before Friday Jul 17, reschedule-within-week rule applies.

Blocked / at risk

  • TD1: pilot school language not named — blocks the vernacular pass locale/script/font decisions.
  • Day-14 preconditions (Jul 29): view-event wiring done 16 Jul (pending deploy with w29-build-merge); Gemini billing link remains (needs a payment method) — confirmed still broken 16 Jul (API key rejected in dev logs).
  • Zero-teachers-in-prod means the wedge audit may reveal onboarding, not features, as the first problem. Eyes open.

Next week (max 3 priorities)

  1. The school visit: workflow audit + WTP close attempt with offer sheet (objective 1).
  2. Honesty fixes (WhatsApp toast, school_code bug) + view-event wiring shipped and verified.
  3. Founders Hub application submitted (pays the Azure bill); start entity/DPIIT paperwork.

Time budget check

School-facing 0% · Build 30% · Ops 70% (planning-heavy founding week — acceptable once, flagged per the rule that build-only weeks get called out)

Clone this wiki locally