This PR updates our JCStress wrapper to use the latest (snapshot) build of JCStress.

The individual group wrappers have been re-generated and their copyright years updated to show up that any possible changes in groups would be addressed.

Testing: standard JCStress groups part1, part2 and part3, no failures or problems found.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8356649: Update JCStress test suite (Enhancement - P4)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/25152/head:pull/25152
$ git checkout pull/25152

Update a local copy of the PR:
$ git checkout pull/25152
$ git pull https://git.openjdk.org/jdk.git pull/25152/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 25152

View PR using the GUI difftool:
$ git pr show -t 25152

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/25152.diff

@bridgekeeper
Copy link

bridgekeeper bot commented May 9, 2025

👋 Welcome back enikitin! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented May 9, 2025

@lepestock This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8356649: Update JCStress test suite

Reviewed-by: lmesnik

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 197 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

As you do not have Committer status in this project an existing Committer must agree to sponsor your change. Possible candidates are the reviewers of this PR (@lmesnik) but any other Committer may sponsor as well.

➡️ To flag this PR as ready for integration with the above commit message, type /integrate in a new comment. (Afterwards, your sponsor types /sponsor in a new comment to perform the integration).

@openjdk openjdk bot added the rfr Pull request is ready for review label May 9, 2025
@openjdk
Copy link

openjdk bot commented May 9, 2025

@lepestock To determine the appropriate audience for reviewing this pull request, one or more labels corresponding to different subsystems will normally be applied automatically. However, no automatic labelling rule matches the changes in this pull request. In order to have an "RFR" email sent to the correct mailing list, you will need to add one or more applicable labels manually using the /label pull request command.

Applicable Labels
  • build
  • client
  • compiler
  • core-libs
  • graal
  • hotspot
  • hotspot-compiler
  • hotspot-gc
  • hotspot-jfr
  • hotspot-runtime
  • i18n
  • ide-support
  • javadoc
  • jdk
  • jmx
  • kulla
  • net
  • nio
  • security
  • serviceability
  • shenandoah

@openjdk openjdk bot added the ready Pull request is ready to be integrated label May 13, 2025
@lepestock
Copy link
Contributor Author

/integrate

@openjdk openjdk bot added the sponsor Pull request is ready to be sponsored label May 14, 2025
@openjdk
Copy link

openjdk bot commented May 14, 2025

@lepestock
Your change (at version 396f2d0) is now ready to be sponsored by a Committer.

@lmesnik
Copy link
Member

lmesnik commented May 16, 2025

/sponsor

@openjdk
Copy link

openjdk bot commented May 16, 2025

Going to push as commit 413843c.
Since your change was applied there have been 233 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label May 16, 2025
@openjdk openjdk bot closed this May 16, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review sponsor Pull request is ready to be sponsored labels May 16, 2025
@openjdk
Copy link

openjdk bot commented May 16, 2025

@lmesnik @lepestock Pushed as commit 413843c.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.