Skip to content

Archive 1

Rafael Gomides edited this page Oct 6, 2026 · 2 revisions

📸 Root page snapshot — 13/09/2026

Historical archive. Source last edited 2026-09-17T12:32:10.931Z. Preserved as historical content; not current product, commands, architecture, implementation or acceptance.

Record of the root page before the documentation reorganization of 17/09/2026. This content is historical and may contain outdated technical status.

Executive summary

Axiom emerged from the evolution of an earlier proposal based on a harness-generating GPT. The recorded direction was to build a more robust solution, initially local-first and CLI-driven, capable of organizing multiple projects and repositories, preparing context for agents, and maintaining traceability between product, code, decisions, and documentation.

Core problem

Development with AI agents often fragments business rules, technical decisions, tasks, evidence, documentation, and execution history.

Recorded proposal

Axiom is the product, domain, policies, and contracts that govern the cycle. Lingo is the executable local control plane responsible for executing or coordinating Axiom contracts. Axiom maintains its own SDD harness, domain, and lifecycle. Spec-Kit is a strategic upstream reference, with no runtime dependency or compatibility guarantee.

Recorded principles

  1. Project is not Repository; Axiom is not Lingo.
  2. Role is not Model; Provider is not Transport; Integration is not MCP.
  3. Spec-Driven Development guides the workflow.
  4. Context must be selected.
  5. Operational state and Evidence do not exist only in conversations.
  6. Portable configuration contains neither secrets nor machine state.
  7. Deterministic validations precede probabilistic judgment.
  8. Documentation evolves with the product.
  9. External integrations are adapters.
  10. Autonomy must be explicit and proportional to risk.
  11. The system works partially without AI.
  12. The first version validates a small vertical workflow.

Recorded status on 13/09/2026

Specification 002 approved; the Plan for the first Lingo slice under human review in PR #4. Tasks and Implementation were recorded as blocked.

Recorded references

Clone this wiki locally