Archive 9

Rafael Gomides edited this page Oct 6, 2026 · 2 revisions

✅ E2E POC — Acceptance and Transition to MVP — 20/09/2026

Historical archive. Source last edited 2026-09-20T14:21:58.553Z. Preserved as historical content; not current product, commands, architecture, implementation or acceptance.

Result: E2E POC accepted by the maintainer on 20/09/2026 after manual validation of the complete flow.

What the POC proved

  • local Axiom/Lingo installation;
  • Codex Runtime with global skills;
  • Project resolution independent of CWD;
  • association with a GitHub Work Item;
  • sequential lifecycle Specification → Clarification → Plan → Tasks → Implementation → Review → Evidence → Reconciliation → Completion;
  • explicit authority for external mutations;
  • workflow persistence and resumption within the POC scope.

Product conclusion

The basic mechanism works and is sufficient as a proof of concept. The MVP should not simply expand the same UX; it needs to make interaction natural and make better use of the Runtime as a layer for capturing intent and providing guidance.

Lessons carried into the MVP

  1. Guided, explicit Project setup, without automatic inference from CWD.
  2. Intent-driven Work Item creation, with an interview and structured draft.
  3. Workflow stage visible in the Provider and relevant transitions documented.
  4. Runtime skills with explicit arguments when Project/Repository/Work Item are already known.

Accepted POC limitations

Persistence/recovery has gaps in proof beyond the controlled scenarios. These points did not invalidate POC acceptance, but need to be reassessed during MVP hardening according to the scope and threat model that are approved.

Next step

Conduct discovery and detailed MVP specification before authorizing implementation. Technical truth and the corresponding backlog remain on GitHub.