Skip to content
Andy Theuninck edited this page Apr 29, 2015 · 1 revision

The recommend method of tracking and updating CORE is using git and github. You're probably reading this on github so you're off to a good start.

Branches

CORE provides several branches at different stages of development. You can change which branch you're running by typing "git checkout" followed by the name of the branch. The master branch is the bleeding edge of development. Unless you are a developer, you probably do not want to run this. The version-x.y branches are numbered versions of CORE. The numbered versions only receive bug fix updates and should be fairly stable.

Updating to a New Numbered Version

Office lists the current version in the footer of most pages. Lane does not. The update procedure is however similar for both components.

  • First run git fetch to download information about new version(s).
  • Run git checkout version-x.y to switch to the new version of the software.
    • If anything goes wrong, you can switch back to the previous version in the exact same way
  • Visit the configuration page for Office or Lane, depending which is running on the machine. This will create any new database structures that are required.
  • Visit the Updates tab of the configuration page. This lists any changes that need to be made to existing database structures. Changes can be applied directly via that page or via the provided command line syntax.
    • Note: Office updates may push changes to all connected Lanes. Generally this is desirable.

Updating Within the Same Numbered Version

Again the procedure is similar for both Lane and Office. Simply run git pull.

Clone this wiki locally