Add option to verify generation for baltic power plants:

Estonian PP, Baltic PP, Auvere PP, Kiisa, RTEC2, RTEC1, Kruonio HPSP, Elektrinai PP. (Stations where generation is 100MW+)

example:
Image

  • UMM Installed capacity can be found at CNE and Contingecy list.
  • UMM available should be taken from UMM platform
  • If ther is no UMM then full generation (Installed) should be shown in available field.
  • Add data from RMM for the specific generation unit.