Skip to content

feat: add INT-M02 automation manifests (IaC) #SHD_2026-W12_005#2

Open
mshahid538 wants to merge 2 commits intoCCCbotNet:mainfrom
mshahid538:main
Open

feat: add INT-M02 automation manifests (IaC) #SHD_2026-W12_005#2
mshahid538 wants to merge 2 commits intoCCCbotNet:mainfrom
mshahid538:main

Conversation

@mshahid538
Copy link

No description provided.

YonksTEAM added a commit that referenced this pull request Mar 18, 2026
…en) | v3.2.3.4

[GTM_2026-W12_269](#masterCCC: GTM_2026-W12_264) ♾️ WeOwnNet 🌐 | #AnythingLLM | [INSTANCE][Plan] INT-M02 (#MetaAgentQwen) | v3.2.3.4

## Changes:
- L-184 test results logged (4/4 PASS, 100%) — Surge fabrication issue RESOLVED
- Workspace Prompt v3.2.3.4 (L-184 integrated: #PinnedDocs static table + RAG LIMITATIONS instruction)
- L-184 tests verified 20:33 MDT W12 Day 2 (INT-M02:tools fresh thread)
- +Section 4 (L-184 Test Results) — TOC 14→15 sections
- instance_status updated (+ L-184 VERIFIED + VSA 89/89 PASS)
- Configuration Step 10 updated (v3.2.3.4 + L-184)
- Verification Step 13 added (L-184 Tests 4/4)
- Related Documents + L-184 + L-185
- FIXES APPLIED: System Prompt FULL TEXT restored (Calhoun finding #1), SharedKernel v3.2.2.1 corrected in L-184 test table (Surge finding #2)
- GATE 2: Calhoun 5/5 + Surge 5/5 = 10/10 PASS (Dual META parallel audit)
- GATE 3: Calhoun 47/47 + Surge 42/42 = 89/89 PASS (PRE GH PUSH VSA VERIFY)
- HUMAN APPROVAL (R-011): GTM_2026-W12_269 (@Gtm #HumanInTheLoop)
- #WeOwnVer calendar-driven (W12 = March = .2, week 3, iteration .4)
- FULL PRESERVE (L-097) — all prior versions retained
- 🚀 GH LIVE

#FedArch #INT-M02 #DualMETA #PRJ-033 #L-184 #L-185 #VSA89of89 #ISC88 #WeOwnSeason003

♾️ WeOwnNet 🌐 ● 🏡 Real Estate and 🤝 cooperative ownership for everyone ● An 🤗 inclusive community, by 👥 invitation only.
YonksTEAM added a commit that referenced this pull request Mar 18, 2026
…3.2.3.1

♾️ WeOwnNet 🌐 | [PRJ-013] Paperless-ngx — Document Management Hub | v3.2.3.1
[GTM_2026-W12_304](#masterCCC: GTM_2026-W09_065)

## Changes:
- REGENERATION + CALHOUN FIXES: #WeOwnVer updated (v3.1.4.1 → v3.2.3.1 — calendar-driven L-094/L-115)
- +dual #LLMmodel header (L-166 — Qwen3.5-397B-A17B + Claude Opus 4.6)
- +deployment timeline reality note (Calhoun Finding #2)
- lifecycle → ✅ APPROVED + 🚀 GH LIVE (D-062)
- 39/41 VSA PASS (VSA_GTM_W12_303 — Calhoun Gate 2+3 audit)
- ALL content PRESERVED (L-097 — 15 TOC sections intact)
- @Gtm MANUALLY UPDATED TIMELINE (W10-W12 → W12-W14 — realistic deployment window)
- AnythingLLM version requirement: v1.9.1+ → v1.11.1+ (current stable)
- Priority: 🟠 P1 → 🔴 P0 (elevated for W12-W14 deployment)
- Email ingestion: summaries@weown.net → anythingllm@weown.net
- Owner assignments: +@cto, +@lfg, +@ldc (team distribution across 14 deliverables)
- Native AnythingLLM connector (v1.9.1+) — ZERO custom code required
- Infrastructure: DigitalOcean ATL1 ($18/mo — 1 vCPU / 2 GB / 50 GB NVMe)
- Tag schema + 9 CCC correspondents mapped (GTM, THY, IAL, RMN, LFG, CRO, CEO, LDC, SHD)
- FOSS alignment verified (GPL-3.0 — self-hosted, data sovereignty)
- Folder: _PROJECTS_/ (PRJ-037 compliant — flat structure)
- Gate 1 (Human Approval R-011): GTM_2026-W12_304
- Gate 2+3 (VSA VERIFY): 39/41 PASS (2 minor findings fixed)

#FlowsBros #FedArch #PRJ-013 #Paperless #DocumentManagement #FOSS #DualMETA #WeOwnSeason003

♾️ WeOwnNet 🌐 ● 🏡 Real Estate and 🤝 cooperative ownership for everyone ● An 🤗 inclusive community, by 👥 invitation only.
YonksTEAM referenced this pull request Mar 23, 2026
…y Evaluation | v3.2.3.1

[GTM_2026-W12_777](#masterCCC) ♾️ WeOwnNet 🌐 | [PRJ-042] #MetaAgentMiMo TRIAL — Xiaomi MiMo-V2 Family Evaluation | v3.2.3.1

## Changes:
- New project: _PROJECTS_/PRJ-042.md — #MetaAgentMiMo TRIAL (Xiaomi MiMo-V2 Family)
- TWO models: MiMo-V2-Flash (FOSS ✅ HuggingFace) + MiMo-V2-Pro (committed FOSS — @_LuoFuli)
- Flash = Surge replacement candidate (day-to-day, MI300X self-hostable, L-129 PASS)
- Pro = governance evaluation (OpenRouter interim, L-129 CONDITIONAL)
- Phase 0: License gate (Flash ✅ / Pro ⚠️ — @_LuoFuli: "We will open-source when stable")
- Phase 1: 5/5 PASS (T1-T5 W12 D7) — MiMo-V2-Pro TRIAL complete (10.5-21.4s, ~85 tok/s)
- Phase 2: Extended eval T6-T10 (Pro) + T1-T5 (Flash) — W13 D1-D3
- Phase 3: Decision matrix (Flash A-C + Pro A-D + Combined 4 scenarios)
- Phase 4: Flash MI300X deployment via vLLM (PRJ-015) + LiteLLM routing (PRJ-016)
- ZDR Gate 0: MiMo-V2-Pro NOT ZDR endpoint — disable in OpenRouter Privacy & Guardrails
- L-215: Per-workspace LLM selection in AnythingLLM (confirmed W12 D7 — same instance, two models)
- L-216: ZDR endpoint limitation (proposed — awaiting R-011)
- 4th #LLMmodel: Xiaomi MiMo-V2-Pro (INT-M02:tools-mimo #MetaAgentMiMo 🧪)
- #TripleMETA PRE GH PUSH VSA: 284/285 (99.6%) — Calhoun 90/91 + Block2 97/97 + MiMo 97/97
- Recursive milestone: MiMo-V2-Pro VSA'd document about its own evaluation (97/97 ✅)
- Workspace prompt identity issue noted (Block 2 — ADMIN bypass — fix W13 D1)
- Calhoun 1 LOW finding: PRJ-015/016 XXX placeholders (non-blocking — verify W13 D1)
- Related Documents: DOC_TITLE format applied (#WeMUSTdoBetter — human-readable titles)
- BP-047 (5 contributors: GTM + Calhoun 🎖️ + Surge ⚡ + MiMo 🧪 + Fuli Luo)
- BP-068 compliant (4× #LLMmodel headers — new ecosystem record)
- [DETAILS] in TOC (L-206 lesson applied)
- EXPLICIT approval: GTM_2026-W12_782 ✅ (R-011 compliant)
- 18 sections; Folder: _PROJECTS_/
- #HumanInTheLoop #docs REVIEW COMPLETE + LOCKED

#FlowsBros #FedArch

♾️ WeOwnNet 🌐 ● 🏡 Real Estate and 🤝 cooperative ownership for everyone ● An 🤗 inclusive community, by 👥 invitation only.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant