You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
schweize8940 edited this page Oct 22, 2019
·
39 revisions
Welcome to the GroupProject wiki!
Current Work to be done is
Till Halfway: 3 Sprints. In order to get to the halfpoint mark of our product backlog we need to have 7 Story points done per sprint
1st Sprint:21-27th
US 01.01.01 As a participant, I want to add a mood event to my mood history, each event with the current date and time, a required emotional state, optional reason, and optional social situation so that I can keep detailed track of my moods. - Nicholas
US 01.02.01 As a participant, I want consistent emoticons and colors to depict and distinguish the emotional states in any view so that I can at a glance easily see what my moods have been like recently. - Maria
Profile US 03.01.01 As a user, I want a profile with a unique username so that I can access specifically my own moods. - Chris
UI Storyboard Redesign - Tim
Total: 7 Points
2nd Sprint: 28th-3rd
3rd Sprint:4th-8th
Done
Have these 4 things done by next monday, 14th. Has to be done by the 18th at 5pm
Product Backlog: Tim - Done (Monday)
User Interface Mockups and Storyboard Sequences: Tim, Maria - Done (Monday)
Object-Oriented Analysis: Chris, Allen, Ansh doc/301Project2UML.PNG
Glossary and Information Sources: Nicholas