-
Notifications
You must be signed in to change notification settings - Fork 0
LYPlusBench
cquarant edited this page Nov 22, 2023
·
28 revisions
- Check List
- Connect via X2GO
- How to (re)start autoprocess
- Slow Control DCS GUI
- Chiller control
- LED control
- HV control
- LED run
- REF run
- LY measurement run
- Runtag convention
- Open airtable link from outside pccmsdaq01
- Check if the parts you want to measure are listed on Airtable - LY Bench. If not SYNC PART LIST ON AIRTABLE
- BEFORE opening the box, check if the HV is OFF, otherwise turn it OFF
- Always put an eye on the chiller conditions in the GUI (localhost:8888). COOLING OK and green
- if a LED run:
- is the LED fiber (black cable from top of the box) inserted in the PMT window?
- is the PULSER ON (LED ON red button in the GUI)?
- is the HV ON and set at the nominal value?
- if a SOURCE run:
- is the LED PULSER OFF (LED OFF yellow button in the GUI)?
- is the HV ON and set at the nominal value?
- is the holder put in the correct position (ie NE corner when looking from the door and above the PMT)
- am I using the correct hole in the holder for the size of the crystal?
- is the source in the box?
- After the processing finished, always validate the run on airtable if the run is good
Open X2GO Client on one of the two PC at the desk
Make sure that session type is set to XFCE
Double click on 'New PMT'
User: cmsdaq
Password: <lab password>
you are now connected to the udoo
N.B.: you have to be connected on INFN VPN if you want to connect from your PC
Autoprocess to be re-implemented
Inherited from LYBench, to be modified
- BS / WS = Black Support / White Support (support printed in Officina meccanica)
- NW / WW = No Wrapping / With Wrapping
- NC / WC = No Couplant / With Couplant
- P1 / P2 / P3 / P4 = Position on PMT: Clockwise ordering starting from North-West corner
- SL / ST = Na22 Source Low (and lateral wrt to bar) / Source on Top of bar
- H1 / H2 / H3 = Size of the hole, respectively for type 1, 2 and 3 crystals