If a `sewer_charge` field is specified, it should be able to reference either 1. A simple flat sewer rate 2. A tiered sewer rate that allows for a cap 3. An "allocation-based" sewer rate based on historical water use.
If a
sewer_chargefield is specified, it should be able to reference either