Skip to content

docs: feature workflow + deploy in CLAUDE.md; close out hero-slideshow#73

Merged
themightychris merged 2 commits into
mainfrom
docs/process-followups
May 19, 2026
Merged

docs: feature workflow + deploy in CLAUDE.md; close out hero-slideshow#73
themightychris merged 2 commits into
mainfrom
docs/process-followups

Conversation

@themightychris
Copy link
Copy Markdown
Member

Summary

Two small follow-ups bundled together because both are docs-shaped and shipped from the same orientation pass.

  1. CLAUDE.md additions — a "Feature workflow" section (specs → plan → implement → close → PR loop) right after the skills inventory, and a "Deploying" section (image build → GitOps pickup → pod boot → live data updates) between Local setup and Source control. Both summarize and link out rather than duplicate operator docs.
  2. hero-slideshow plan closeout — PR feat(web): hero photo slideshow with Ken Burns pan + crossfade #67 merged 2026-05-19 but the plan stayed in-progress. Flip to done, tick the validation checklist (all confirmed during the PR's browser verification), fill Notes + Follow-ups per specops closeout ritual.

Test plan

  • Read both new CLAUDE.md sections — do they orient a fresh contributor without overlapping the operator docs?
  • Confirm plans/hero-slideshow.md is status: done with all validation boxes ticked and pr: 67 recorded

🤖 Generated with Claude Code

themightychris and others added 2 commits May 19, 2026 14:49
Two early-reader gaps in CLAUDE.md surfaced while orienting a fresh
session: (1) the spec → plan → implement → close → PR loop was implied
by the specops skill but not summarized as a quick map, and (2) deploy
had no top-level orientation — operators had to dig into
docs/operations/ to even know GitOps was the path.

Feature workflow goes right after the skills inventory so the skill
references resolve. Deploy goes between Local setup and Source control,
parallel to "how to develop" / "how this ships".

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Closeout was skipped when PR #67 merged on 2026-05-19 — the plan stayed
in-progress despite shipped + green CI. Flip to done, tick the validation
checklist (all confirmed during the PR's browser verification), and fill
in Notes + Follow-ups per the specops closeout ritual.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@themightychris themightychris merged commit 8561a91 into main May 19, 2026
1 check passed
@themightychris themightychris deleted the docs/process-followups branch May 19, 2026 20:04
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant