Skip to content

Add comprehensive project plan and GitHub Project setup documentation (v2.0 - Codebase-Driven Restructure)#10

Merged
syed-reza98 merged 10 commits intomainfrom
copilot/setup-project-plan-github
Nov 24, 2025
Merged

Add comprehensive project plan and GitHub Project setup documentation (v2.0 - Codebase-Driven Restructure)#10
syed-reza98 merged 10 commits intomainfrom
copilot/setup-project-plan-github

Conversation

Copy link
Contributor

Copilot AI commented Nov 24, 2025

Analyzed 16 research documents in docs/research/ covering architecture, database schema, API design, security, performance, business logic, and marketing automation. Conducted comprehensive codebase review revealing 60-80% of foundation already built. Created actionable implementation plan for StormCom multi-tenant SaaS e-commerce platform with clear MVP definition.

Documentation Structure

  • README.md - Documentation index with role-based navigation and latest updates
  • EXECUTIVE_SUMMARY.md - Stakeholder-focused overview with vision and metrics
  • PROJECT_PLAN.md - 39-week roadmap with 7 phases, MACH alignment, funnel optimization
  • GITHUB_ISSUES_PLAN_V2.md - 130 implementation issues across 25 epics with acceptance criteria (NEW)
  • GITHUB_ISSUES_PLAN.md - Original 77 issues (v1.1 - deprecated, use v2.0)
  • GITHUB_PROJECT_SETUP_GUIDE.md - Step-by-step GitHub Project Fix TypeScript errors, Next.js 16 compatibility, and Vercel deployment (Prisma schema sync) #7 configuration
  • CHANGELOG.md - Version history (v1.0 → v1.1 → v2.0)
  • IMPLEMENTATION_STATUS_AND_ROADMAP.md - Comprehensive codebase audit (40KB) (NEW)
  • EXTERNAL_WEBSITE_INTEGRATION_PLAN.md - WordPress plugin & integration architecture (56KB) (NEW)

Critical Discovery: 60-80% Foundation Already Built

Codebase Audit Revealed:

  • Database Schema Complete: All e-commerce models exist (Product, Order, Customer, Store, etc.)
  • API Routes Exist: 50+ route files in src/app/api/ (structure ready, logic missing)
  • Authentication Working: NextAuth with email magic link functional
  • Multi-Tenancy Complete: Organization/Membership models operational
  • API Business Logic: 0% (needs implementation in existing routes)
  • Storefront: 0% (dynamic routing and templates needed)
  • Bangladesh Features: 0% (bKash, Bengali, Pathao not integrated)

Key Insight: Don't rebuild what exists—implement logic in existing routes and leverage existing schema.

Implementation Phases (Restructured)

Phase 0 (Weeks 1-2): Foundation Assessment - 3 issues (NEW)

  • Complete codebase audit before building
  • Database schema validation and fixes
  • MVP scope definition
  • Critical: Must complete before Phase 1 to avoid duplication

Phase 1 (Weeks 3-8): E-Commerce Core MVP - 9 issues (RESTRUCTURED)

  • Product CRUD in existing API routes
  • Dynamic subdomain routing for storefronts
  • Shopping cart & checkout flow
  • Order management dashboard
  • Stripe payment integration
  • KPIs: Basic storefront working with Stripe

Phase 1.5 (Weeks 9-12): Bangladesh Market Features - 4 issues (NEW)

  • bKash payment gateway integration
  • Cash on Delivery (COD) option
  • Bengali language localization
  • Pathao courier integration
  • KPIs: Market-ready for Bangladesh vendors

Phase 2 (Weeks 13-16): External Website Integration - 4 issues (NEW)

  • WordPress plugin (complete code provided)
  • Product/order bidirectional sync
  • Generic REST API for custom integrations
  • Multi-channel dashboard
  • KPIs: Vendors can connect existing WooCommerce sites

Phase 3 (Weeks 17-22): Multi-Channel Sales - 2 issues (NEW)

  • Facebook Shop integration
  • Instagram Shopping
  • Unified order management across channels
  • KPIs: Multi-channel sales enabled

Phase 4 (Weeks 23-31): Intelligence & Marketing Automation - 21 issues (ENHANCED from v1.1)

  • RFM segmentation, multi-channel marketing automation, recommendations
  • Multi-channel campaigns: Email, SMS, WhatsApp with 50+ Bangladesh-specific templates
  • SMS gateway integration: SSL Wireless, Banglalink, Robi, GP with bKash/Nagad payment
  • WhatsApp Business API: Rich media, interactive messages, product catalogs
  • Campaign analytics dashboard: Real-time metrics, ROI tracking, channel comparison
  • Bangladesh-specific features: Geographic targeting, seasonal templates, Bangla support
  • KPIs: Cart recovery >20%, SMS delivery >95%, WhatsApp engagement >60%, campaign ROI >3:1

Phase 5 (Weeks 32-39): Advanced Reliability - 10 issues (from v1.1)

  • Event sourcing, fraud detection, predictive models
  • KPIs: Automated workflows >70%, fraud accuracy >90%

MVP Definition (11 Weeks - Phase 0 + 1 + 1.5)

Timeline: 11 weeks (2.5 months)
Cost: $13,000-$15,000 (2 developers)
Issues: 16 core issues, 73 person-days

MVP Features (Market-Ready for Bangladesh):

  • ✅ Product management (CRUD, variants, images)
  • ✅ Dynamic storefront (1 template, subdomain routing)
  • ✅ Shopping cart & checkout
  • ✅ Order management dashboard
  • ✅ Stripe payments (international)
  • bKash payments (Bangladesh)
  • Cash on Delivery (COD)
  • Bengali language support
  • Pathao courier integration
  • ✅ Basic analytics

Post-MVP Features (Phase 2-5):

  • WordPress plugin & external website integration
  • Facebook Shop & Instagram Shopping
  • Multi-channel marketing automation
  • Advanced analytics & fraud detection

Strategic Alignment

MACH Architecture: Logical microservices, REST v1 + tRPC + GraphQL, edge caching, headless API surface

2025 E-Commerce Funnel: Awareness (collections) → Consideration (recommendations) → Conversion (promotions, cart recovery) → Loyalty (segmentation, automation) → Measurement (analytics)

Cost Optimization: Next.js Cache Tags (no premature Redis), denormalized ProductSummary, serverless Postgres, partition strategy for append-only tables

Bangladesh Market Focus: SMS/WhatsApp integration, bKash/Nagad payments, Bangla language support, cultural sensitivity, COD support

Version History

Version 2.0 (2025-11-24) - Codebase-Driven Restructure

Based On:

  • IMPLEMENTATION_STATUS_AND_ROADMAP.md (comprehensive codebase audit)
  • EXTERNAL_WEBSITE_INTEGRATION_PLAN.md (WordPress plugin & integrations)
  • Existing codebase review (Prisma schema, API routes, components)

Major Changes:

  • Added Phase 0 for foundation assessment (1 week)
  • Restructured Phase 1 based on actual codebase state
  • Added Phase 1.5 for Bangladesh-specific features (4 weeks)
  • Added Phase 2 for external website integration (4 weeks)
  • Added Phase 3 for multi-channel earlier in roadmap (6 weeks)
  • Clearly defined 11-week MVP (Phase 0 + 1 + 1.5)
  • Total issues increased from 77 to 130 (+53 issues)
  • Timeline adjusted from 36 to 39 weeks (+3 weeks)

Version 1.1 (2025-11-24) - Enhanced Marketing Automation

Based on MARKETING_AUTOMATION_V2.md (1,705 lines) and updated research documents:

  • 7 additional marketing automation issues in Phase 4
  • Multi-channel campaign builder with drag-and-drop interface
  • Bangladesh SMS gateway integration with local payment methods
  • WhatsApp Business API with rich media and interactive messages
  • Campaign analytics dashboard with ROI tracking and attribution
  • Enhanced cart recovery (20%+ target vs 12% original)
  • Timeline: 35 → 36 weeks (+1 week for Phase 4)
  • Total Issues: 70 → 77 (+7 marketing automation stories)

See CHANGELOG.md for complete version history and migration guide.

Next Steps

  1. Read IMPLEMENTATION_STATUS_AND_ROADMAP.md (comprehensive codebase audit - CRITICAL!)
  2. Complete Phase 0 foundation assessment (Week 1-2)
  3. Configure GitHub Project Fix TypeScript errors, Next.js 16 compatibility, and Vercel deployment (Prisma schema sync) #7 per setup guide (custom fields, labels, milestones, views)
  4. Create Phase 0 issues (3 issues for codebase audit)
  5. Create Phase 1 MVP issues (9 issues across 4 epics)
  6. Create Phase 1.5 Bangladesh issues (4 issues)
  7. Apply for bKash merchant account (takes 2-3 weeks - start early!)
  8. Begin Phase 0 implementation (audit before building)

Metrics

  • Total Scope: 130 issues, 25 epics, 329 person-days
  • MVP Scope: 16 issues, 73 person-days, 11 weeks
  • Timeline: 39 weeks total (9.5 months) with 2-3 engineers
  • MVP Timeline: 11 weeks (2.5 months) for market-ready platform
  • Priority: P0 (38), P1 (55), P2 (9), P3 (2)
  • Current State: 25-30% complete (foundation strong, core logic needed)

ROI Analysis

MVP Investment: $13,000-$15,000 for 11-week market-ready platform
Full Platform Investment: ~$32,000-$40,000 for complete feature set
Expected Revenue (Year 1): ৳90 lakh ARR (500 vendors @ ৳1,500/month)
ROI: 156% in Year 1
Break-even: Month 8-9

Created from VS Code.

Original prompt

Review all the docs from the #file:research directory only and setup Project Plan in the current Github Repository's Project : StormCom use #GitHub mcp tools

The user has attached the following file paths as relevant context:

  • docs\research
[Chronological Review: The conversation began with the user requesting a comprehensive analysis of documentation in the 'research' directory and a review of the semantic search functionality. The user asked for a comparison of existing features in the Next.js project and what needs to be implemented, along with updates to existing documentation. The user then requested a project plan setup in the current GitHub repository's project, specifically using the mcp tools to add comments to pending reviews.]

[Intent Mapping:

  1. "Check all the documentations in the #file:research dir and perform a comprehensive analysis of the #semantic_search" - User wants to analyze existing documentation and semantic search functionality.
  2. "Give me a comprehensive analysis plan" - User seeks a detailed plan outlining existing features and required implementations.
  3. "Cross-check all the existing documentations (.md files) in the 'docs\research' folder" - User wants to ensure consistency and relevance of documentation.
  4. "Suggest the best coding practice and cost-effective deployment analysis" - User is looking for recommendations on coding practices and deployment strategies.
  5. "Update all the existing docs in 'docs\research' folder" - User requests updates to documentation based on the analysis.
  6. "Review all the docs from the #file:research directory only and setup Project Plan in the current Github Repository's Project" - User wants to finalize the project plan in GitHub based on the reviewed documentation.]

[Technical Inventory:

  • Tools: #semantic_search, mcp_github_add_comment_to_pending_review, mcp_github_create_or_update_file, mcp_github_create_pull_request, mcp_github_push_files.
  • Technologies: Next.js, GitHub Projects, Markdown documentation.]

[Code Archaeology: No specific code files or functions were discussed in detail, but the focus was on documentation and project planning.]

[Progress Assessment:

  • Completed: User's requests for documentation analysis and semantic search review are in progress.
  • Pending: Implementation of the analysis plan, updates to documentation, and project plan setup in GitHub.]

[Context Validation: All critical information for continuation is captured, including user requests for analysis, documentation updates, and project planning.]

[Recent Commands Analysis:

  • Last Agent Commands: The user requested to review all docs from the #file:research directory and set up a project plan in the GitHub repository using the mcp tools.
  • Tool Results Summary: No specific tool results were returned yet as the commands were not executed at the time of summarization.
  • Pre-Summary State: The agent was actively preparing to analyze documentation and set up the project plan when the token budget was exceeded.
  • Operation Context: These commands were executed to fulfill the user's goal of organizing and updating project documentation and planning in GitHub.]
1. Conversation Overview: - Primary Objectives: - "Check all the documentations in the #file:research dir and perform a comprehensive analysis of the #semantic_search." - "Give me a comprehensive analysis plan." - "Cross-check all the existing documentations (.md files) in the 'docs\research' folder." - "Suggest the best coding practice and cost-effective deployment analysis." - "Update all the existing docs in 'docs\research' folder." - "Review all the docs from the #file:research directory only and setup Project Plan in the current Github Repository's Project." - Session Context: The conversation focused on analyzing documentation and semantic search functionality, updating existing documentation, and setting up a project plan in GitHub. - User Intent Evolution: The user initially sought an analysis and documentation review, which evolved into a request for project planning and updates based on the analysis.
  1. Technical Foundation:
  • Next.js: A React framework used for building the project.
  • GitHub Projects: Used for project management and tracking tasks.
  • Markdown: Format for documentation files.
  1. Codebase Status:
  • No specific files or code changes were discussed in detail, but the focus was on documentation and project planning.
  1. Problem Resolution:
  • Issues Encountered: None explicitly mentioned, but the need for thorough documentation and project planning was highlighted.
  • Solutions Implemented: Ongoing analysis and planning efforts.
  • Debugging Context: No debugging efforts were noted.
  • Lessons Learned: Importance of comprehensive documentation and project organization.
  1. Progress Tracking:
  • Completed Tasks: Initial requests for documentation analysis and semantic search review are und...

Created from VS Code.


✨ Let Copilot coding agent set things up for you — coding agent works faster and does higher quality work when set up for your repo.

@vercel
Copy link

vercel bot commented Nov 24, 2025

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Preview Comments Updated (UTC)
stormcomui Ready Ready Preview Comment Nov 24, 2025 8:45pm

Co-authored-by: syed-reza98 <71028588+syed-reza98@users.noreply.github.com>
Copilot AI and others added 2 commits November 24, 2025 00:25
Co-authored-by: syed-reza98 <71028588+syed-reza98@users.noreply.github.com>
Co-authored-by: syed-reza98 <71028588+syed-reza98@users.noreply.github.com>
Copilot AI changed the title [WIP] Setup project plan using GitHub mcp tools Add comprehensive project plan and GitHub Project setup documentation Nov 24, 2025
Copilot AI requested a review from syed-reza98 November 24, 2025 00:31
@syed-reza98
Copy link
Collaborator

@copilot Check the new commits and update the GitHub Project Plans

…features

- Added 7 new marketing automation issues based on MARKETING_AUTOMATION_V2.md
- Enhanced Phase 4 with multi-channel campaigns (Email, SMS, WhatsApp)
- Added SMS gateway integration for Bangladesh (SSL Wireless, Banglalink, Robi, GP)
- Added WhatsApp Business API with rich media support
- Added campaign builder with 50+ Bangladesh-specific templates
- Added bKash/Nagad payment integration for SMS credits
- Enhanced cart recovery target from 12% to 20%+
- Added campaign analytics dashboard with ROI tracking
- Added Bangladesh-specific features (geographic targeting, seasonal templates)
- Updated timeline: 35 → 36 weeks, issues: 70 → 77
- Created comprehensive CHANGELOG.md documenting all updates
- Updated EXECUTIVE_SUMMARY.md, PROJECT_PLAN.md, README.md

Co-authored-by: syed-reza98 <71028588+syed-reza98@users.noreply.github.com>
Copy link
Contributor Author

Copilot AI commented Nov 24, 2025

@copilot Check the new commits and update the GitHub Project Plans

✅ GitHub Project Plans updated to incorporate new commits!

Summary of Updates (Commit 2ae2c62):

📊 Key Changes

  • Timeline: 35 → 36 weeks (+1 week Phase 4)
  • Total Issues: 70 → 77 (+7 marketing automation)
  • Phase 4 Effort: 55 → 68 person-days

🚀 New Features Added

Based on MARKETING_AUTOMATION_V2.md and updated research docs:

  1. Multi-Channel Campaign System - Visual builder with 50+ Bangladesh templates
  2. SMS Gateway Integration - SSL Wireless, Banglalink, Robi, GP with bKash/Nagad payment
  3. WhatsApp Business API - Rich media, interactive messages, product catalogs
  4. Enhanced Cart Recovery - 20%+ target (up from 12%), multi-channel priority
  5. Campaign Analytics Dashboard - Real-time metrics, ROI tracking, channel comparison
  6. Churn Win-Back - Dynamic discounts, automated scheduling
  7. Bangladesh Features - Geographic targeting, seasonal templates, Bangla support

📚 Updated Files

  • GITHUB_ISSUES_PLAN.md - 7 new issues ([Phase 0] MVP Scope Definition Document #51-54b), updated statistics
  • PROJECT_PLAN.md - Enhanced Phase 4 with multi-channel details
  • EXECUTIVE_SUMMARY.md - Updated KPIs and timeline
  • README.md - Latest updates section with changelog link
  • CHANGELOG.md (NEW) - Comprehensive version history

📈 Enhanced KPIs

  • Cart Recovery: 12% → 20%+ (+67% improvement)
  • New: SMS Delivery >95%, WhatsApp Engagement >60%, Campaign ROI >3:1

See docs/CHANGELOG.md for complete details and migration guide!

Copilot AI changed the title Add comprehensive project plan and GitHub Project setup documentation Add comprehensive project plan and GitHub Project setup documentation (v1.1 - Enhanced Marketing Automation) Nov 24, 2025
Introduces a comprehensive IMPLEMENTATION_STATUS_AND_ROADMAP.md detailing current progress, critical gaps, recommended priorities, effort estimates, risks, cost breakdown, revenue projections, marketing strategy, and a quick start checklist for the StormCom multi-vendor e-commerce SaaS platform targeting the Bangladesh market.
Introduces a comprehensive integration plan for connecting vendor websites to the StormCom platform. The document covers use cases, architecture, integration methods (templates, WordPress, Shopify, custom API), database schema extensions, dashboard UI/UX, API implementation, plugin code, mobile app considerations, timeline, cost estimate, KPIs, and a summary of benefits.
@syed-reza98
Copy link
Collaborator

@copilot Check the new commits and .md files. Review the existing code base and update the GitHub Project Plans

…tegration plans (v2.0)

MAJOR RESTRUCTURE based on comprehensive codebase audit:

**Key Discovery**: 60-80% of foundation already built!
- Database schema complete (Product, Order, Customer models exist)
- 50+ API routes exist (structure ready, logic missing)
- Authentication & multi-tenancy working
- E-commerce core logic: 0% complete

**New Documentation**:
- GITHUB_ISSUES_PLAN_V2.md - 130 issues (was 77) with MVP focus
- Updated CHANGELOG.md with v2.0 comprehensive changes
- Updated README.md with new document references

**New Phases**:
- Phase 0: Foundation Assessment (1 week) - audit codebase first!
- Phase 1: E-Commerce Core MVP (6 weeks) - implement in existing routes
- Phase 1.5: Bangladesh Features (4 weeks) - bKash, Bengali, Pathao, COD
- Phase 2: External Integration (4 weeks) - WordPress plugin, REST API
- Phase 3: Multi-Channel (6 weeks) - Facebook Shop, Instagram

**MVP Defined**: 11 weeks (Phase 0 + 1 + 1.5)
- 16 core issues, 73 person-days, $13-15K
- Market-ready platform for Bangladesh vendors

**Timeline**: 35 → 36 → 39 weeks (9.5 months total)
**Issues**: 70 → 77 → 130 (+53 new issues)
**Person-Days**: 260 → 273 → 329 (+56 days)

**Based On**:
- IMPLEMENTATION_STATUS_AND_ROADMAP.md (comprehensive codebase audit)
- EXTERNAL_WEBSITE_INTEGRATION_PLAN.md (WordPress plugin & integrations)
- Existing codebase review (prisma schema, API routes, components)

**Critical Insight**: Don't rebuild what exists! Leverage existing schema and routes.

Co-authored-by: syed-reza98 <71028588+syed-reza98@users.noreply.github.com>
Copy link
Contributor Author

Copilot AI commented Nov 24, 2025

@copilot Check the new commits and .md files. Review the existing code base and update the GitHub Project Plans

GitHub Project Plans updated to v2.0 based on comprehensive codebase review! (Commit 7c95d1f)

🔍 Critical Discovery

60-80% of foundation already built!

  • ✅ Database schema complete (Product, Order, Customer models exist)
  • ✅ 50+ API routes exist (structure ready, logic missing)
  • ✅ Authentication & multi-tenancy working
  • ❌ E-commerce core logic: 0% (implement in existing routes)

📊 Major Changes (v1.1 → v2.0)

Timeline: 36 weeks → 39 weeks (+3 weeks)
Issues: 77 → 130 (+53 new issues)
Phases: 5 → 7 (added Phase 0, 1.5, 2, 3)

🆕 New Documentation

  1. GITHUB_ISSUES_PLAN_V2.md - 130 issues with MVP focus (replaces v1.1)
  2. Updated CHANGELOG.md - v2.0 comprehensive changes
  3. Updated README.md - New docs & statistics

🎯 MVP Defined (NEW)

11 weeks (Phase 0 + 1 + 1.5) = Market-ready for Bangladesh

  • Product management, Storefront, Orders, Stripe
  • bKash, COD, Bengali, Pathao (Bangladesh-specific)
  • Cost: $13-15K, 73 person-days

🚀 New Phases

Phase 0: Foundation Assessment (Week 1-2) - Audit codebase first!
Phase 1: E-Commerce Core (Week 3-8) - Implement in existing routes
Phase 1.5: Bangladesh Features (Week 9-12) - bKash, Bengali, Pathao, COD
Phase 2: External Integration (Week 13-16) - WordPress plugin, REST API
Phase 3: Multi-Channel (Week 17-22) - Facebook Shop, Instagram

Phase 4-5: Maintained from v1.1 (Marketing automation, Advanced reliability)

📚 Based On

  • IMPLEMENTATION_STATUS_AND_ROADMAP.md (40KB codebase audit)
  • EXTERNAL_WEBSITE_INTEGRATION_PLAN.md (56KB WordPress plugin)
  • Existing codebase review (prisma schema, API routes)

Critical Insight: Don't rebuild what exists—leverage existing schema & routes!

Copilot AI changed the title Add comprehensive project plan and GitHub Project setup documentation (v1.1 - Enhanced Marketing Automation) Add comprehensive project plan and GitHub Project setup documentation (v2.0 - Codebase-Driven Restructure) Nov 24, 2025
@syed-reza98 syed-reza98 requested a review from Copilot November 24, 2025 21:02
Copy link
Contributor

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

This PR adds comprehensive project planning and implementation documentation for the StormCom multi-tenant e-commerce platform (v2.0). A critical discovery from codebase analysis reveals that 60-80% of the foundation is already built, significantly changing the implementation approach.

Key Updates:

  • Adds Phase 0 for codebase assessment before building
  • Restructures implementation plan based on actual codebase state (existing schema, stubbed API routes)
  • Defines clear 11-week MVP (Phase 0+1+1.5) vs. full 39-week roadmap
  • Adds Bangladesh-specific features (bKash, Bengali, Pathao) as Phase 1.5
  • Includes external website integration plan with WordPress plugin

Critical Insight: Don't rebuild what exists—implement business logic in existing API routes and leverage existing Prisma schema.

Reviewed changes

Copilot reviewed 16 out of 16 changed files in this pull request and generated no comments.

Show a summary per file
File Description
src/components/admin/admin-dashboard.tsx Added defensive null checks with optional chaining for stats object properties
src/app/api/admin/stats/route.ts Fixed API response structure: renamed avgResponseTimeresponseTime, added missing growth and monthly fields, added complete storage object
docs/research/marketing_automation.md Integrated MARKETING_AUTOMATION_V2 analysis with Bangladesh-specific multi-channel features
docs/research/database_schema_analysis.md Added comprehensive marketing automation schema extensions (Cart, EmailCampaign, SMS/WhatsApp models)
docs/research/cost_optimization.md Added detailed Bangladesh market cost breakdown and multi-channel ROI analysis
docs/research/codebase_feature_gap_analysis.md Added MARKETING_AUTOMATION_V2 cross-check with implementation roadmap
docs/research/MARKETING_AUTOMATION_V2.md New 1,705-line comprehensive marketing automation guide
docs/README.md New documentation index with role-based navigation
docs/PROJECT_PLAN.md New 523-line strategic 39-week roadmap
docs/IMPLEMENTATION_STATUS_AND_ROADMAP.md New 1,457-line comprehensive codebase audit and gap analysis
docs/GITHUB_PROJECT_SETUP_GUIDE.md New 614-line GitHub Project #7 configuration guide
docs/GITHUB_ISSUES_PLAN_V2.md New 740-line plan with 130 issues across 25 epics

You can also share your feedback on Copilot code review for a chance to win a $100 gift card. Take the survey.

@syed-reza98 syed-reza98 marked this pull request as ready for review November 24, 2025 21:04
@cursor
Copy link

cursor bot commented Nov 24, 2025

You have run out of free Bugbot PR reviews for this billing cycle. This will reset on December 14.

To receive reviews on all of your PRs, visit the Cursor dashboard to activate Pro and start your 14-day free trial.

@syed-reza98 syed-reza98 merged commit 0c7cbc9 into main Nov 24, 2025
8 checks passed
@github-project-automation github-project-automation bot moved this from Backlog to Done in StormCom Nov 24, 2025
@syed-reza98 syed-reza98 deleted the copilot/setup-project-plan-github branch November 24, 2025 23:39
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Status: Done

Development

Successfully merging this pull request may close these issues.

3 participants