[Rule] 3-Partition to Sequencing to Minimize Weighted Tardiness #473

@isPANN

Description

@isPANN

Source: 3-Partition
Target: Sequencing to Minimize Weighted Tardiness
Motivation: 3-PARTITION is a strongly NP-complete number-partitioning problem; SEQUENCING TO MINIMIZE WEIGHTED TARDINESS asks whether tasks can be scheduled on a single processor so that total weighted tardiness stays within a bound K. By encoding the 3-PARTITION bins as deadline-separated time slots and setting task weights to enforce exact packing, the reduction establishes that weighted tardiness minimization is NP-complete in the strong sense — ruling out any pseudo-polynomial time algorithm unless P = NP.

Reference: Garey & Johnson, Computers and Intractability, Appendix A5.1, p.237-238

GJ Source Entry

[SS5] SEQUENCING TO MINIMIZE WEIGHTED TARDINESS
INSTANCE: Set T of tasks, for each task t E T a length l(t) E Z+, a weight w(t) E Z+, and a deadline d(t) E Z+, and a positive integer K.
QUESTION: Is there a one-processor schedule σ for T such that the sum, taken over all t E T satisfying σ(t) + l(t) > d(t), of (σ(t) + l(t) - d(t))*w(t) is K or less?
Reference: [Lawler, 1977a]. Transformation from 3-PARTITION.
Comment: NP-complete in the strong sense. If all weights are equal, the problem can be solved in pseudo-polynomial time [Lawler, 1977a] and is open as to ordinary NP-completeness. If all lengths are equal (with weights arbitrary), it can be solved in polynomial time by bipartite matching. If precedence constraints are added, the problem is NP-complete even with equal lengths and equal weights [Lenstra and Rinnooy Kan, 1978a]. If release times are added instead, the problem is NP-complete in the strong sense for equal task weights (see SEQUENCING WITH RELEASE TIMES AND DEADLINES), but can be solved by bipartite matching for equal lengths and arbitrary weights [Graham, Lawler, Lenstra, and Rinnooy Kan, 1978].

Reduction Algorithm

Summary:

Given a 3-PARTITION instance: a set A = {a_1, ..., a_{3m}} of 3m positive integers with bound B such that B/4 < a_i < B/2 for all i and Σa_i = mB, construct a SEQUENCING TO MINIMIZE WEIGHTED TARDINESS instance as follows.

  1. Partition tasks: For each element a_i ∈ A, create a task t_i with length l(t_i) = a_i and weight w(t_i) = W (a sufficiently large weight, e.g., W = (mB)^2 + 1). Set deadline d(t_i) = jB for the j-th group, assigned so that exactly three tasks must fit in each time slot of length B.

  2. Separator tasks: Create m − 1 separator (or "filler") tasks s_1, ..., s_{m−1}, each with length l(s_j) = 0 (or a negligible length), very large weight to force them into specific positions, and deadlines that partition the time horizon into m consecutive slots of length B each: [0, B], [B, 2B], ..., [(m−1)B, mB].

  3. Deadlines and weights enforce grouping: Each partition task t_i has its deadline set so that it must be completed within one of the m time slots. The large weight W ensures that any tardiness incurs a cost exceeding the budget K, effectively forcing zero tardiness for all tasks. Set K = 0 (or a value that allows no tardiness at all).

  4. Correctness: Because B/4 < a_i < B/2, exactly three elements must sum to B in each slot. A 3-partition of A exists if and only if all tasks can be scheduled with zero total weighted tardiness (i.e., meeting all deadlines).

  5. Solution extraction: Given a feasible schedule σ with total weighted tardiness ≤ K = 0, the tasks scheduled in the j-th time slot [(j−1)B, jB] correspond to a triple of elements summing to exactly B.

Size Overhead

Symbols:

  • m = number of triples in the 3-PARTITION instance (source has 3m elements)
  • B = bin capacity
Target metric (code name) Polynomial (using symbols above)
num_tasks 3 * m + (m - 1) = 4 * m - 1
max_length B (maximum task length)
max_deadline m * B
max_weight O((mB)^2)
bound_K 0

Derivation: The 3m element tasks come directly from the 3-PARTITION elements. Up to m − 1 separator tasks enforce the time-slot boundaries. All deadlines are multiples of B up to mB. Construction is O(m).

Validation Method

  • Closed-loop test: construct a 3-PARTITION instance with 3m = 6 elements (m = 2), reduce to SEQUENCING TO MINIMIZE WEIGHTED TARDINESS, enumerate all permutations of tasks on the single processor, verify that a zero-tardiness schedule exists iff the 3-PARTITION instance is feasible.
  • Check that the constructed instance has 4m − 1 tasks (approximately), all deadlines are multiples of B, and K = 0.
  • Edge cases: test with an infeasible 3-PARTITION instance (expect no zero-tardiness schedule), and with m = 1 (three elements summing to B, trivial case).

Example

Source instance (3-PARTITION):
A = {5, 6, 7, 8, 9, 10}, B = 15, m = 2
Check: B/4 = 3.75 < a_i < B/2 = 7.5 — note that 8, 9, 10 violate the upper bound, so adjust:
A = {4, 5, 6, 4, 5, 6}, B = 10, m = 2
Check: B/4 = 2.5 < a_i < B/2 = 5 — 5 and 6 violate. Adjust again:
A = {3, 3, 4, 3, 3, 4}, B = 10, m = 2
Check: 2.5 < {3,3,4,3,3,4} < 5 ✓, Σ = 20 = 2 × 10 ✓

Feasible 3-partition: {3, 3, 4} and {3, 3, 4}, each summing to 10.

Constructed SEQUENCING TO MINIMIZE WEIGHTED TARDINESS instance:

Task Length Weight Deadline
t_1 3 1000 10
t_2 3 1000 10
t_3 4 1000 10
t_4 3 1000 20
t_5 3 1000 20
t_6 4 1000 20
s_1 0 10000 10

K = 0 (total weighted tardiness bound).

Solution:
Schedule in slot [0, 10]: t_1 (0–3), t_2 (3–6), t_3 (6–10), s_1 at time 10.
Schedule in slot [10, 20]: t_4 (10–13), t_5 (13–16), t_6 (16–20).
All tasks meet their deadlines. Total weighted tardiness = 0 ≤ K ✓

Solution extraction:
Triple 1: {a_1, a_2, a_3} = {3, 3, 4}, sum = 10 = B ✓
Triple 2: {a_4, a_5, a_6} = {3, 3, 4}, sum = 10 = B ✓

References

  • [Lawler, 1977a]: [Lawler1977a] Eugene L. Lawler (1977). "A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness". Annals of Discrete Mathematics 1, pp. 331–342.
  • [Lenstra and Rinnooy Kan, 1978a]: [Lenstra1978a] Jan K. Lenstra and A. H. G. Rinnooy Kan (1978). "Complexity of scheduling under precedence constraints". Operations Research 26, pp. 22–35.
  • [Graham, Lawler, Lenstra, and Rinnooy Kan, 1978]: [Graham1978] R. L. Graham and E. L. Lawler and J. K. Lenstra and A. H. G. Rinnooy Kan (1978). "Optimization and approximation in deterministic sequencing and scheduling: a survey". Annals of Discrete Mathematics.

Metadata

Metadata

Assignees

No one assigned

    Labels

    ruleA new reduction rule to be added.

    Type

    No type

    Projects

    Status

    Backlog

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions