[Model] OpenShopScheduling #506

@isPANN

Description

@isPANN

Important

Build as optimization, not decision. Value = Min<usize>.
Objective: Minimize makespan (completion time of the last task).
Do not add a bound/threshold field — let the solver find the optimum directly. See #765.

Motivation

OPEN-SHOP SCHEDULING (P198) from Garey & Johnson, A5 SS14. A classical NP-hard scheduling problem in which each job consists of one task per machine, and tasks of the same job may be processed in any order (unlike flow-shop where the order is fixed, or job-shop where each job has a prescribed route). The goal is to minimize the makespan. NP-complete for m ≥ 3 machines by reduction from PARTITION (Gonzalez & Sahni, 1976). Polynomial for m = 2 machines and for the preemptive variant with any number of machines.

Associated rules:

  • R143: Partition → OpenShopScheduling (this model is the target)

Definition

Name: OpenShopScheduling
Reference: Garey & Johnson, Computers and Intractability, A5 SS14

Mathematical definition:

INSTANCE: Number m ∈ Z⁺ of machines, set J of n jobs, each job j ∈ J consisting of m tasks t₁[j], t₂[j], …, tₘ[j] (task tᵢ[j] is executed by machine i), and for each task a processing time p(j, i) ∈ Z⁰⁺.

OBJECTIVE: Find an open-shop schedule — a collection of one-machine schedules σᵢ for i = 1, …, m — that minimizes the makespan (completion time of the last task), subject to:

  1. Machine constraint: On each machine i, tasks do not overlap (non-preemptive).
  2. Job constraint: For each job j, its tasks on different machines do not overlap in time (a job occupies at most one machine at a time).

The corresponding decision problem (GJ SS14) asks whether a schedule exists with makespan ≤ D for a given deadline D.

Variables

  • Count: n × m (one variable per job-machine pair, representing the start time). The start time domain is bounded by D_max = Σ_j max_i p(j,i) · n (a loose upper bound).
  • Per-variable domain: For ILP formulation, binary ordering variables x_{j,k,i} (job j before job k on machine i) plus integer start time variables. For brute-force, enumerate orderings of jobs on each machine: (n!)^m permutations.
  • Meaning: σᵢ(j) is the start time of job j's task on machine i. The evaluate function computes the makespan and checks both constraints.

dims() returns [n; n × m] (permutation of n jobs on each of m machines).

Schema (data type)

Type name: OpenShopScheduling
Variants: none (no type parameters)

Field Type Description Getter
num_machines usize Number of machines m num_machines()
processing_times Vec<Vec<usize>> Processing time matrix: p[j][i] for job j, machine i (n × m) num_jobs()self.processing_times.len()

Problem type: Optimization (minimization)
Value type: Min<usize>

Complexity

  • Decision complexity: NP-complete for m ≥ 3 (Gonzalez & Sahni, 1976; transformation from PARTITION). NP-complete in the strong sense for arbitrary m (Lenstra, 1977). Polynomial for m = 2.
  • Best known exact algorithm: Brute-force enumerates (n!)^m orderings across all machines. For the general case, exact methods use ILP or constraint programming.
  • Complexity string for declare_variants!: "factorial(num_jobs)^num_machines" (enumerate all orderings of jobs on each machine)
  • Special cases:
    • m = 2: polynomial (Gonzalez & Sahni, 1976)
    • Preemptive variant: polynomial for any m (Gonzalez & Sahni, 1976)
    • Preemptive with release times: polynomial for m = 2 (Cho & Sahni, 1978)
  • References:
    • [Gonzalez & Sahni, 1976] T. Gonzalez and S. Sahni, "Open shop scheduling to minimize finish time", JACM 23(4), pp. 665-679, 1976.
    • [Lenstra, 1977] J. K. Lenstra, "Sequencing by enumerative methods", Mathematisch Centrum, Amsterdam, 1977.
    • [Cho & Sahni, 1978] Y. Cho and S. Sahni, "Preemptive scheduling of independent jobs with release and due dates on open, flow and job shop", 1978.

Extra Remark

Full book text:

INSTANCE: Number m in Z+ of processors, set J of jobs, each job j in J consisting of m tasks t1[j],t2[j], ..., tm[j] (with ti[j] to be executed by processor i), a length l(t) in Z0+ for each such task t, and an overall deadline D in Z+.
QUESTION: Is there an open-shop schedule for J that meets the deadline, i.e., a collection of one-processor schedules sigmai: J->Z0+, 1 <= i <= m, such that sigmai(j) > sigmai(k) implies sigmai(j) >= sigmai(k) + l(ti[k]), such that for each j in J the intervals [sigmai(j), sigmai(j) + l(ti[j])) are all disjoint, and such that sigmai(j) + l(ti[j]) <= D for 1 <= i <= m, 1 <= j <= |J|?

Reference: [Gonzalez and Sahni, 1976]. Transformation from PARTITION.

Comment: Remains NP-complete if m = 3, but can be solved in polynomial time if m = 2. NP-complete in the strong sense for m arbitrary [Lenstra, 1977]. The general problem is solvable in polynomial time if "preemptive" schedules are allowed [Gonzalez and Sahni, 1976], even if two distinct release times are allowed [Cho and Sahni, 1978].

Note: The original GJ formulation is a decision problem with deadline D. This issue reformulates it as an optimization problem (minimize makespan). The decision version is recovered by checking whether the optimal makespan ≤ D.

How to solve

  • It can be solved by (existing) bruteforce. Enumerate all (n!)^m orderings of jobs on each machine; for each, greedily compute start times respecting job constraints; return minimum makespan.
  • It can be solved by reducing to integer programming. Binary ILP with ordering variables x_{j,k,i} ∈ {0,1} (job j before k on machine i), integer start times σᵢ(j), non-overlap constraints, and makespan minimization.
  • Other: Polynomial for m = 2 (Gonzalez-Sahni); preemptive variant solvable in polynomial time by LP.

Example Instance

Input:
m = 3 machines, J = {J₁, J₂, J₃, J₄} (n = 4 jobs)

Processing time matrix p[j][i]:

Job Machine 1 Machine 2 Machine 3
J₁ 3 1 2
J₂ 2 3 1
J₃ 1 2 3
J₄ 2 2 1

Per-machine totals: M₁ = 8, M₂ = 8, M₃ = 7. Per-job totals: J₁ = 6, J₂ = 6, J₃ = 6, J₄ = 5.
Lower bound: max(8, 6) = 8.

Optimal schedule (makespan = 11):

Machine Schedule
M₁ J₃[0,1), J₂[1,3), J₁[3,6), J₄[6,8)
M₂ J₃[1,3), J₂[3,6), J₁[6,7), J₄[8,10)
M₃ J₃[3,6), J₁[7,9), J₂[9,10), J₄[10,11)

Job timelines (verify no overlap within each job):

  • J₁: M₁[3,6) → M₂[6,7) → M₃[7,9) — disjoint ✓
  • J₂: M₁[1,3) → M₂[3,6) → M₃[9,10) — disjoint ✓
  • J₃: M₁[0,1) → M₂[1,3) → M₃[3,6) — disjoint ✓
  • J₄: M₁[6,8) → M₂[8,10) → M₃[10,11) — disjoint ✓

Makespan = 11 (J₄ finishes last on M₃ at time 11).

Suboptimal feasible schedules (confirming non-triviality):

  • Makespan 12: 30 valid orderings achieve this
  • Makespan 13: 113 valid orderings
  • Makespan 15+: majority of the 13,824 orderings

Out of 13,824 total machine-ordering combinations (24³), only 4 achieve the optimal makespan of 11, with 13 distinct makespan values ranging from 11 to 23.

Expected outcome: Min(11)

Reduction Rule Crossref

  • R143: Partition → OpenShopScheduling
  • Direct ILP: OpenShopScheduling → ILP (ordering + start time formulation)

Metadata

Metadata

Assignees

No one assigned

    Labels

    GoodAn issue passed all checks.modelA model problem to be implemented.

    Type

    No type

    Projects

    Status

    Done

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions