For each level of hazard severity, capture the likely direct impacts on the asset (for example, “High impact” – catastrophic destruction; “Medium impact” - substantial loss of service and consequent disruption for months; “Low impact”– disruption limited to a few hours only – T #52 #133
Replies: 1 comment
|
Give a field to input a note on 'total impact' -> likelihood on total loss from loss off asset and impact of time Time to return -> temporal measure -> can it be returned to acceptable operation within weeks/months/years -> redundancy assessment for specific asset Stress testing assets |
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Need to talk about how this will be implemented
Part of Asset Inventory: Capturing the perils to which each asset is exposed