Status: Accepted Date: 2026-05-18 Deciders: Michael Zargham Related: ADR-021 Three Attestation Subclasses Ship in v0.1; ADR-025 Reproducibility is Structural and Local; ADR-028 Scope-Level Adequacy and Sufficiency for Federated Audit; ADR-029 Engineering Lifecycle Stages as Scope Metadata; Attestation Infrastructure in v0.1; Verifiable Self-Certification; Gap Taxonomy; Engineering Lifecycle Stages; Design Spec §4.3
v0.1's earlier design used earl:result (passed / failed / inapplicable / cantTell) as the outcome property on rtm:Attestation, supplemented by a separate rtm:DeferredJudgment concept for "engineer surfaced the judgment moment but hasn't resolved it." For regression handling — when an upstream change invalidates a downstream attestation — the design relied on a scope-level lifecycle state machine (per ADR-029 Engineering Lifecycle Stages as Scope Metadata's earlier framing): the scope falls back to an earlier lifecycle stage, and the v0.2 auto-rerun mechanism re-evaluates affected attestations against the new state.
That scope-level state machine violated the methodology-neutrality axiom. Making engineering lifecycle stages first-class metadata on every named graph privileges a specific lifecycle vocabulary (INCOSE / ISO/IEC/IEEE 15288). Real-world adopters use different lifecycle models — DO-178C DAL gates in airborne software, NASA Phase A–F, ISO 9001 process gates, Agile sprint cycles, MIL-STD-498 phasing, customer-program-specific milestones — and the framework should not require translation into INCOSE just to participate. Additionally, maintaining a state machine on every named graph added substantial complexity to the core ruleset for what is fundamentally a per-attestation regression-handling concern.
This ADR replaces the scope-level state-machine mechanism with a four-state attestation status vocabulary that operates at the attestation level. Lifecycle stages remain available — see the reframed ADR-029 Engineering Lifecycle Stages as Scope Metadata — but as optional organizational-convenience metadata, not first-class state.
v0.1 introduces rtm:attestationStatus as a required functional property on every rtm:Attestation, with four permissible values:
| Status IRI | Meaning |
|---|---|
rtm:status/pass |
Attestation is valid and the claim holds. Equivalent to earl:passed. |
rtm:status/fail |
Attestation is valid and the claim does not hold. Equivalent to earl:failed. |
rtm:status/deferred |
Engineer surfaced the judgment moment but has not yet resolved it. Subsumes the prior rtm:DeferredJudgment concept. |
rtm:status/deprecated |
Attestation existed and was valid, but is now invalidated by upstream changes. A new attestation is required. |
EARL alignment via SKOS exact-match (rtm:status/pass skos:exactMatch earl:passed; same for fail) preserves interop with EARL tooling. The deferred and deprecated states have no EARL analogues; they are RTM-native.
Deprecation provenance. When an attestation is marked rtm:status/deprecated, it SHOULD carry prov:wasInvalidatedBy (W3C PROV-O standard) referencing the activity, commit, or upstream change that invalidated it. This makes deprecation forensically traceable through the cert artifact.
SHACL discipline. The named-approver shape on rtm:Attestation is unchanged (ADR-021 Three Attestation Subclasses Ship in v0.1 continues to govern). A new shape rtm:AttestationStatusShape requires rtm:attestationStatus (sh:minCount 1, sh:in (rtm:status/pass rtm:status/fail rtm:status/deferred rtm:status/deprecated)) on every rtm:Attestation instance.
Cert pass criterion (updated). A graph passes certification at scope S iff every required attestation in scope exists AND is in rtm:status/pass. The default behavior treats fail, deferred, and deprecated as cert-blocking; profiles --profile=accept-deferred and --profile=accept-deprecated allow adopters to relax for non-production cert runs.
Gap codes (extension to Gap Taxonomy):
-
T6.failed-attestation — attestation with
rtm:status/fail. Unchanged in spirit; vocabulary updated. -
T9.deprecated-attestation (new) — attestation with
rtm:status/deprecatedand no replacement attestation in scope. The audit report enumerates these with theirprov:wasInvalidatedBycause so the team knows what to re-attest. -
T10.deferred-attestation (new) — attestation with
rtm:status/deferred. Always reported as informational; becomes cert-blocking when--profile=no-deferredis active.
Lifecycle stages decoupled. Engineering lifecycle stages remain available via the optional rtm:lifecycleStage vocabulary (per the reframed ADR-029 Engineering Lifecycle Stages as Scope Metadata) for organizational convenience, but the core ruleset does NOT maintain a state machine on them. The regression-handling mechanism that previously rode on lifecycle-stage rollback now rides on attestation deprecation: when upstream changes invalidate a downstream claim, the affected attestation is marked rtm:status/deprecated with prov:wasInvalidatedBy, and the cert artifact surfaces it as a T9 gap with provenance.
- Methodology-neutral. No adopter is forced into INCOSE / ISO 15288 lifecycle vocabulary. Programs using DO-178C, NASA Phase A–F, Agile, ISO 9001, or custom phasing participate on the same footing. The polycentric ASOT model (ADR-030 Polycentric ASOT Authority Model) extends naturally to methodology diversity: different orgs in a composition can use different lifecycle vocabularies (or none) without translating into a privileged one.
- Simpler core ruleset. No state machine on scopes in the core. The v0.2 work that previously included "lifecycle-aware regression handling" simplifies to "attestation deprecation cascade" — a more local, more inspectable mechanism.
-
Deprecation is provenance-traceable.
prov:wasInvalidatedByis W3C PROV-O standard. Auditors can trace any deprecated attestation back to the change that deprecated it withoutflexo-rtm-specific tooling. - Attestation lifecycle is local to the attestation. The status of a single attestation is determined by its own data (the four-state property and optional provenance), not by reference to a coordinating state machine. This is structurally consistent with the locality principle (ADR-025 Reproducibility is Structural and Local).
- Federated audit composes cleanly across methodologies. Org A using INCOSE stages and Org B using Agile sprints can both produce composable attestations because the attestation status vocabulary is common; only the (optional) lifecycle-stage tags differ.
- Some adopters may want scope-level lifecycle gates. Programs that explicitly want to gate certifications on lifecycle stage transitions can still do so via optional profiles built on top of the lifecycle-stage vocabulary — but the framework does not ship that mechanism in core. Programs not wanting it are not paying for it.
- Loses the "auto-rerun on scope rollback" affordance from the original ADR-029 design. The equivalent mechanism is now "attestation deprecation cascade" — when upstream changes invalidate a downstream claim, dependent attestations are marked deprecated automatically (v0.2 work). The cascade is more local, but its design surface is different from a state machine.
- Three new gap codes (T9, T10 added; T6 vocabulary updated) require conformance test updates and audit-report rendering work.
-
earl:resultbecomes a parallel less-precise vocabulary. Conformance with EARL tooling is preserved via SKOS exact-match for the two states that have EARL analogues. Tools consuming the RDF can choose either property;rtm:attestationStatusis canonical insideflexo-rtm. -
rtm:DeferredJudgmentis folded intortm:status/deferred. The standalone class is preserved for historical interop; new content uses the status value.
- Keep the scope-level lifecycle state machine. Rejected for methodology-neutrality reasons named in the Context. The framework should not privilege INCOSE / ISO 15288 over DO-178C, NASA, Agile, or custom phasing.
-
Use
earl:resultand addrtm:isDeprecatedas an orthogonal axis. Cleaner in some respects (judgment outcome vs. lifecycle status as separate dimensions), but the maintainer's framing is a single four-state union and adopting that framing simplifies the SHACL shape and the audit-report rendering. Orthogonal axes can be reintroduced later if needed. - Drop EARL alignment entirely. Rejected — SKOS exact-match preserves interop with EARL tooling at trivial cost. There is no reason to break compatibility.
-
Extend EARL with new outcome values for
deferredanddeprecated. Rejected — EARL is a W3C vocabularyflexo-rtmdoes not own. Adding values would create a parallel non-standard EARL that confuses both EARL consumers andflexo-rtmadopters.rtm:attestationStatuscleanly separates RTM-native states from W3C EARL. - Make deprecation a separate event entity (not a status on the attestation). Rejected as adding a layer of indirection. A deprecation is conceptually a change in the attestation's status; modeling it as a status value (with PROV-O provenance) is direct.
-
Vocabulary.
rtm:attestationStatus(owl:FunctionalProperty); four IRI-typed values underrtm:status/. SKOS concept scheme withskos:exactMatchto EARL for pass/fail. -
SHACL.
rtm:AttestationStatusShape(separate fromrtm:AttestationShapeto keep the two enforcements independent).sh:minCount 1,sh:in (...). Applies to allrtm:Attestationsubclasses including the three v0.1 subclasses (satisfaction/adequacy/sufficiency per ADR-021 Three Attestation Subclasses Ship in v0.1) and the federated-audit subclasses (ADR-028 Scope-Level Adequacy and Sufficiency for Federated Audit). -
PROV-O.
prov:wasInvalidatedBy(W3C standard). Forrtm:status/deprecatedattestations, SHOULD be present; the strict profile--profile=deprecated-requires-provenancemakes it MUST. -
v0.2 deprecation cascade. When upstream changes invalidate downstream claims, the oracle marks dependent attestations
rtm:status/deprecatedautomatically and recordsprov:wasInvalidatedByreferencing the change. This replaces the lifecycle-state-machine auto-rerun mechanism in the original ADR-029 framing. The cascade detection uses SPARQL over the diff between commits (per Transcript Replay Semantics). -
Migration from earlier text. Pages that referenced "lifecycle state machine," "scope rollback," "fall-back to an earlier stage" now refer to "attestation deprecation cascade" with status
rtm:status/deprecated. The user-facing semantics (recertification is prompted when prior work is invalidated) are preserved; the mechanism is more local.
- Design Spec §4.3 (Attestation infrastructure — three subclasses); needs revision to add the four-state status vocabulary
- Attestation Infrastructure in v0.1 — primary elaboration; updated to add the four-state section
- ADR-021 Three Attestation Subclasses Ship in v0.1 — the subclass decision this orthogonally extends
- ADR-029 Engineering Lifecycle Stages as Scope Metadata — reframed to "optional, methodology-neutral"
- Gap Taxonomy — updated for T6 vocabulary refinement and new T9 / T10 codes
- Verifiable Self-Certification — the cert pass criterion that consumes the four-state status
- Engineering Lifecycle Stages — methodology-neutral framing; INCOSE / ISO 15288 as one example
- W3C PROV-O
prov:wasInvalidatedBy - W3C EARL
earl:result - W3C SKOS
skos:exactMatch
- Flexo Git Coexistence
- ADCS Prototype Lessons
- MVC Pattern from RIME TRL ANT
- Human-AI Accountability
- Multi-Agent Discourse Graph Precedent
- OSLC RM and QM Review
- INCOSE V2 Review
- OMG SysMLv2
- PROV EARL GSN P-PLAN
- Dragon Architecture and Mission Enterprise
- Traditional Forward and Backward Analysis
- Attestation Infrastructure in v0.1
- Identity Boundaries and Policy Projections
- External URI References
- Signed Envelopes and Established Standards
- Aspect Coverage with Adequacy and Sufficiency
- Federated Audit and Composition
- Certification Predicate
- Gap Taxonomy
- Quantitative Outcomes
- Engineering Lifecycle Stages (v0.2)
- Topological Framework Future Work (research phase)
- Vertices Edges Faces (research phase)
- Three-Layer Architecture
- Operational Layer UX Discipline
- Storage Layer Flexo Conventions
- Analysis Layer Scope Algebra
- OSLC Roundtrip Acceptance
- Identity Adapter Contract
- Flexo REST Binding
- SysMLv2 Ingestion Contract
- External URI Rules
- Signed Envelope Shapes
- Parsimony Manifest
- Lossless Roundtrip Definition
- Vendor Extension Carry-Through
- OSLC RM Adapter Contract
- OSLC QM Adapter Contract
- ADR Template
- ADR-001 Foundations First Approach
- ADR-002 SysMLv2 Anchoring
- ADR-003 Topological Framework Documented as Future Work
- ADR-003a v0.1 Ships Traditional Analysis Only
- ADR-004 Quantitative Certification Outcome
- ADR-005 Adequacy and Sufficiency as Guidance Subtypes
- ADR-006 Three-Layer Architecture
- ADR-007 Scope as First-Class RDF Resource
- ADR-008 Repo Name and Org Transfer Plan
- ADR-009 Two-Repo Strategy
- ADR-010 OSLC-RM and OSLC-QM in v0.1
- ADR-011 Lossless Criterion A plus C
- ADR-012 Direct RDF Properties over Reified Edges
- ADR-013 Simplicial Complex as Derived View When Built
- ADR-014 Parsimony Layer Build-Time Extraction
- ADR-015 GSN Adoption for Adequacy and Sufficiency
- ADR-016 Composable SHACL Profiles
- ADR-017 knowledgecomplex as Optional Extras
- ADR-018 V minus F Invariant Deferred with Topological Framework
- ADR-019 Derived Binary View from Quantitative Metrics
- ADR-020 Vocabulary Alignment with Zargham 2026
- ADR-021 Three Attestation Subclasses Ship in v0.1
- ADR-022 External URI References as Open-Source Foundation
- ADR-023 Cryptography by Composition of Battle-Tested Standards
- ADR-024 Identity by Thin Projection of External Sources
- ADR-025 Reproducibility is Structural and Local
- ADR-026 Cryptographic Agility via Algorithm Profiles
- ADR-027 Bit-Exactness vs Numerical Tolerances Are Both First-Class
- ADR-028 Scope-Level Adequacy and Sufficiency for Federated Audit
- ADR-029 Engineering Lifecycle Stages as Scope Metadata
- ADR-030 Polycentric ASOT Authority Model
- ADR-031 Attestation Status Pass Fail Deferred Deprecated
- ADR-032 Methodology Agnosticism as Foundational Axiom
- ADR-033 Generalized ASOT Principle for All Identified Things