Status — Forward-compat scope for v0.1; full mechanism lands in v0.2. This page documents engineering lifecycle stages as first-class metadata on scopes (named graphs). v0.1 ships the vocabulary (
rtm:lifecycleStageand the INCOSE/ISO 15288 canonical stage IRIs) so adopters can tag scopes today; the stage-aware oracle behavior and lifecycle state machine ship in v0.2. This is the next roadmap item after v0.1 — distinct from the topological framework, which is still in research phase (Topological Framework Future Work). Adopters who tag scopes in v0.1 get forward-compatible data; the v0.2 oracle activates the stage-aware semantics against that data. Locked in ADR-029 Engineering Lifecycle Stages as Scope Metadata.
Systems do not come into existence ex nihilo. They emerge from engineering work that often starts with concept formulation (including the framing, stakeholder engagement, and requirements specification that the INCOSE Systems Engineering Handbook places inside the Concept stage), then proceeds into development, production, utilization, support, and eventually retirement. New scopes come into existence underspecified and gain detail over time; some scopes that reach production are returned to earlier stages by changes that invalidate prior certifications.
The INCOSE Systems Engineering Handbook and ISO/IEC/IEEE 15288 treat lifecycle stages as a first-class organizing concept and define a canonical six-stage set (see INCOSE V2 Review). flexo-rtm should be able to assign those stages to scopes (named graphs) and to use those stages to gate which checks apply, which gaps are blocking vs. informational, and when re-certification is prompted. This is engineering work that complements the structural traceability and attestation infrastructure v0.1 ships — it does not require the topological framework or new research, but it does require coordinated oracle + operational-layer + skill work that is properly scoped for v0.2.
Principle: use existing standards, do not reinvent. flexo-rtm's stage vocabulary is exactly the canonical INCOSE/ISO 15288 six stages — no flexo-rtm-specific additions, no parallel "exploratory" or "requirements-specification" sub-stages. Programs already organize around these stages; the early framing and requirements work that some practitioners colloquially call "exploratory" sits inside the Concept stage as defined by the standards, and finer-grained distinctions (concept-of-operations vs. requirements-specification vs. design entry) are tracked through aspects, milestones, or program-specific metadata layered on top, not by minting new top-level stages.
The motivation has two direct consequences (paraphrasing the user's framing in issue #6):
- Early-stage scopes (named graphs) that do not satisfy requirements traceability are not expected to — gating on T1 (orphan requirement) or T2 (dangling evidence) during Concept-stage work would be noisy and create UX issues. The lifecycle stage tells the oracle to treat those gaps as informational, not blocking, at the Concept stage.
- Later-stage scopes that have previous certifications fall back into earlier states when changes are committed that invalidate prior certifications. Some of these will be automatically rerunnable due to the reproducibility machinery (Verifiable Self-Certification, Transcript Replay Semantics); others will require human re-attestation. The lifecycle stage machine is the mechanism that ensures recertification is prompted when appropriate and that no unintended regressions go undetected.
v0.1 ships the following lifecycle vocabulary so adopters can begin tagging scopes today, accumulating forward-compatible data the v0.2 oracle will activate:
| Term | Type | Role |
|---|---|---|
rtm:lifecycleStage |
owl:ObjectProperty |
Asserts a scope's current lifecycle stage. Domain: rtm:Scope (and named-graph metadata per Storage Layer Flexo Conventions F4). Range: rtm:LifecycleStage. |
rtm:LifecycleStage |
owl:Class |
Class of lifecycle stage IRIs; each stage IRI below is an instance. |
rtm:lifecycleStageRecordedAt |
owl:DatatypeProperty |
xsd:dateTime of when the stage was assigned. Mandatory under v0.2 stage-aware profiles; recommended in v0.1. |
rtm:lifecycleStageTransition |
owl:ObjectProperty |
Provenance of a stage transition. Subject: rtm:Scope. Object: a rtm:LifecycleStageTransition blank-or-named node carrying prov:wasGeneratedBy, rtm:fromStage, rtm:toStage, rtm:approvedBy, prov:atTime. |
rtm:LifecycleStageTransition |
owl:Class |
A first-class transition event. Subject of named-approver SHACL (the same sh:minCount 1 ; sh:nodeKind sh:IRI on rtm:approvedBy) under the v0.2 stage-transition profile. |
The six canonical lifecycle stages from the INCOSE Systems Engineering Handbook and ISO/IEC/IEEE 15288, aligned via skos:closeMatch per the INCOSE V2 Review adoption pattern:
| Stage IRI | INCOSE / ISO 15288 stage | Typical condition |
|---|---|---|
rtm:stage/concept |
Concept | Stakeholder needs identified; concept-of-operations forming; requirements being elicited, analyzed, and specified |
rtm:stage/development |
Development | Requirements specified; models built; design and integration evidence accumulating |
rtm:stage/production |
Production | Full certification achieved; system being produced or fielded |
rtm:stage/utilization |
Utilization | System in operational use; in-service evidence accruing |
rtm:stage/support |
Support | System maintained; modifications evaluated |
rtm:stage/retirement |
Retirement | System being decommissioned; legacy evidence preserved |
Per the INCOSE handbook, the Concept stage explicitly includes the activities that programs sometimes describe as "exploratory" or "requirements-specification" — stakeholder requirements definition, system requirements definition, and concept-of-operations work all happen here. flexo-rtm does not introduce parallel sub-stages for these activities; they are tracked through other mechanisms (aspects, program milestones, the operational-layer skill's prompts), not through new top-level stage IRIs. This keeps the stage vocabulary identical to the standards programs already organize around.
A worked Turtle tag on a scope:
rtm:scope/adcs-attitude-control a rtm:Scope ;
rtm:lifecycleStage rtm:stage/development ;
rtm:lifecycleStageRecordedAt "2026-05-17T10:00:00Z"^^xsd:dateTime ;
rtm:lifecycleStageTransition :transition-2026-05-17-development .
:transition-2026-05-17-development a rtm:LifecycleStageTransition ;
rtm:fromStage rtm:stage/concept ;
rtm:toStage rtm:stage/development ;
rtm:approvedBy <https://example.org/approver/lead-engineer-zargham> ;
prov:atTime "2026-05-17T10:00:00Z"^^xsd:dateTime ;
prov:wasGeneratedBy :commit-9a3f .The transition is itself a first-class attestable event. Under the v0.2 stage-transition profile (see below), every transition MUST carry a rtm:approvedBy IRI just like any other attestation; the existing SHACL bottleneck from Identity Boundaries and Policy Projections applies to transitions because rtm:LifecycleStageTransition will be configured as a target of the bottleneck shape under the active profile.
A scope tagged rtm:stage/concept is exempt from traditional bidirectional certification gates. Specifically, gap codes T1 (orphan-requirement) and T2 (dangling-evidence) are reported as informational, not blocking, at this stage. The justification is operational: during the Concept stage, an unsatisfied requirement is the expected state — the team is still framing the problem, eliciting stakeholder needs, and specifying requirements. Gating on it would be noisy and force engineers to suppress checks they actually want to keep running for the data they're collecting.
The relaxation is stage-aware, not blanket. Even at the Concept stage:
- T6 (failed attestation) remains blocking — a recorded failure is still a recorded failure, regardless of stage.
- T7 (unapproved attestation) remains structurally impossible — the named-approver SHACL bottleneck is on the parent class and is unconditional.
- T8 (aspect-uncovered) remains active only if the
aspect-coverageprofile is on, and remains informational at Concept stage even when it does.
At rtm:stage/development, T1 and T2 begin to apply as blocking — requirements are specified and traceability is now expected. T3, T4, T5, T8 apply per their active profile (still informational unless their profile is on; their severity becomes blocking at Development when their profile is on).
The full mapping of T-code blocking-vs-informational by stage is established in v0.2; the design sketch in ADR-029 Engineering Lifecycle Stages as Scope Metadata is:
| Stage | T1 | T2 | T3 | T4 | T5 | T6 | T7 | T8 |
|---|---|---|---|---|---|---|---|---|
| concept | inf | inf | inf | inf | inf | block | n/a | inf |
| development | block | block | block | block | block | block | n/a | block |
| production | block | block | block | block | block | block | n/a | block |
| utilization | block | block | block | block | block | block | n/a | block |
| support | block | block | block | block | block | block | n/a | block |
| retirement | block | block | block | block | block | block | n/a | block |
("inf" = informational; "block" = blocking; "n/a" = structurally impossible.) The exact relaxation matrix is an open question for v0.2 design — programs may want finer-grained control (per aspect, per T-code) via the lifecycle profile configuration, e.g., aspect-coverage gates on safety-aspect requirements that activate earlier than other aspects.
A scope tagged rtm:stage/development or later that has prior certifications, when changes are committed that invalidate prior certifications, falls back to an earlier state until re-certification lands. The state-machine semantics:
- Auto-rerunnable. Where the reproducibility machinery (per Verifiable Self-Certification and Transcript Replay Semantics) can re-execute the recorded transcript steps deterministically against the new state, the certification is re-evaluated automatically. The same canonical inputs + same recorded transcript ⇒ same result hash; if the change is upstream of a fact, that fact's hash changes and the cert is re-derived; if the change is independent of a fact, that fact's certification is preserved without further attestation work.
- Manual re-cert prompted. Where re-execution requires human judgment — attestations of adequacy or sufficiency by a named approver, qualified-role audits (Federated Audit and Composition) — the engineering team is prompted to re-certify. The operational-layer skill surfaces this on commit (Operational Layer UX Discipline); the prompt is part of the same judgment-surfacing flow that exists today for new attestations.
The fall-back rules:
- A change that invalidates the structural completeness of a fact (the RDF neighborhood, external URIs, projection-at-cert-time, or signatures) drops the scope from its current stage back to
development. The change is within the existing requirement set; the team needs to re-establish satisfying evidence under the same specification. - A change that adds, removes, or alters requirements drops the scope back to
concept. New or changed requirements need to be specified before development-stage gates apply; the work returns to the Concept stage's requirements-specification activities. - A change that removes or alters guidance (the adequacy/sufficiency criteria themselves) drops the scope back to
developmentand additionally invalidates prior adequacy/sufficiency attestations referencing the changed criteria. - A change purely to documentation, comments, or operationally-inert metadata does not change the stage.
The dispatch is mechanical: SPARQL queries over the diff between the prior commit's audit graph and the new commit's audit graph identify which fall-back rule applies. The lifecycle state machine, in this sense, is an analytical-layer extension that operates over the cert artifact's existing structure (Verifiable Self-Certification) — it does not require new evidence kinds or new attestation types.
Sketch of the canonical transitions (v0.2 will lock the diagram):
-
concept→development(requirements specified; design and integration work beginning; traceability gates fully apply) -
development→production(full certification achieved) -
production→utilization(system fielded; operational evidence begins accruing) -
utilization→support(system in maintenance phase) -
support→retirement(system being decommissioned) - Any later stage →
development(rollback on evidence invalidation or guidance change) - Any later stage →
concept(rollback on requirement addition or change)
Transitions are themselves attestable events recorded with PROV provenance and named approvers (per the v0.2 stage-transition profile). The vocabulary for transitions ships in v0.1 (rtm:lifecycleStageTransition, rtm:fromStage, rtm:toStage); the SHACL profile that requires rtm:approvedBy on transitions activates in v0.2.
Cross-scope dependencies are an explicit v0.2 design question: when a downstream scope depends on an upstream scope's certification, lifecycle-aware regression must cascade. A downstream scope at production whose upstream scope falls back to development must itself either fall back or carry an explicit attestation that the upstream change is irrelevant to the downstream certification. The cascade semantics — and the SPARQL pattern that detects them — are in scope for v0.2.
v0.1 ships the vocabulary so adopters can tag scopes today. The state-machine logic, the gate-relaxation rules per stage, the auto-rerun handling, and the re-cert prompts require coordinated oracle + operational-layer + skill work that is in scope for v0.2:
- Oracle. The SPARQL queries that dispatch T-code severity by stage; the diff-and-fall-back analysis between commits; the auto-rerun replay path for stage-aware re-evaluation.
- Operational layer. The skill prompts that surface re-cert obligations on commit; the working-set materialization that filters checks by stage; the UX for asserting a stage transition.
- Storage layer. The commit-metadata round-trip for lifecycle stage (per Storage Layer Flexo Conventions F4); the audit-graph append for transition events.
By contrast, the v0.1 work for federated audit (Federated Audit and Composition) only requires new SHACL profiles and SPARQL queries on existing vocabulary patterns — minimal new oracle work, no coordinated state-machine rollout. That asymmetry is why federated audit ships in v0.1 and lifecycle stages ship vocabulary-only in v0.1, mechanism in v0.2.
The vocabulary is stable. Adopters tagging scopes today are not at risk of rework: the IRIs, the property names, the transition-event shape are settled by ADR-029 Engineering Lifecycle Stages as Scope Metadata. The v0.2 oracle activates the stage-aware semantics against the data v0.1 adopters have already accumulated. Because the six stages match INCOSE/ISO 15288 exactly, programs already organizing around the standard can adopt without translation.
The topological framework is research-phase deferred (Topological Framework Future Work). It requires a community-curated registry of pre-approved artifact types, research on alternative invariants to V−F, governance for recursive completeness, and an open question set that includes whether the framework's chosen invariants are sufficient. Its timeline is open and depends on community engagement.
Lifecycle stages are engineering-phase deferred. The vocabulary is settled — it is the INCOSE/ISO 15288 canonical six stages, full stop. The mechanism — a state machine with stage-aware gate dispatch — is straightforward engineering work that operates over the v0.1 cert-artifact structure already shipped. The timeline is clear: v0.2.
The distinction matters for adopters and reviewers:
- An adopter who wants to ship lifecycle-aware certification can rely on the v0.2 roadmap — they will tag scopes in v0.1, accumulate the data, and the v0.2 oracle will read it without rework. The mechanism arrival is a near-term engineering commitment.
- An adopter who wants to ship topological-framework-aware certification cannot rely on a near-term roadmap — the framework's arrival depends on research outcomes and registry governance that are not yet settled.
This is what the Mission and Thesis framing is naming when it identifies lifecycle stages and federated audit as the two near-term extensions of the v0.1 baseline.
A power-subsystem scope starts in rtm:stage/concept. The engineering team is framing the problem and eliciting stakeholder requirements; some requirements are stated but the set is still evolving; the named-approver discipline applies on every attestation they do author, but T1 and T2 gap codes are reported as informational, not blocking.
As requirements firm up and the team commits to a specified set, they commit a stage transition to rtm:stage/development. The transition is recorded as a rtm:LifecycleStageTransition with the lead engineer's rtm:approvedBy IRI. T1 and T2 now apply as blocking — orphan requirements indicate incomplete development; dangling evidence indicates trace gaps that need to be resolved. T3–T5 and T8 apply per their active profiles.
Development proceeds. The scope reaches full certification under the active profile set (attested-satisfies + attested-adequacy + attested-sufficiency + aspect-coverage), and is promoted to rtm:stage/production.
A new requirement is added — a late-breaking thermal constraint from the systems engineer. The commit triggers the lifecycle state machine:
- SPARQL diff identifies that a new
rtm:Requirementinstance has been added. - The fall-back rule fires: addition of new requirements drops the scope to
rtm:stage/concept— the new requirement needs to be specified before development-stage gates apply to it. - The lifecycle state machine records the transition with provenance.
The new requirement gets specified, then development resumes. The team transitions back to rtm:stage/development, adds evidence, writes attestations, runs the certification. The auto-rerunnable path handles most of the prior certifications: every fact whose canonical inputs are unchanged retains its prior result hash via Transcript Replay Semantics; every fact whose adequacy/sufficiency criteria are unchanged retains its prior attestations.
Where the new requirement intersects prior adequacy claims — e.g., the rigid-body assumption was attested as adequate "for the slew-rate regime," and the thermal constraint introduces a regime change — the skill prompts the engineer for re-attestation. The engineer either attests the prior adequacy still holds (with updated rationale) or attests it does not, triggering a model refresh. The cert artifact records the new attestation chain transparently.
Once all prior certifications are either auto-revalidated or re-attested, the scope advances back to rtm:stage/production. The audit report shows the full lifecycle history: when the scope entered each stage, when it transitioned, what triggered each transition, who attested each transition. The certification is honest about its temporal trajectory — there is no pretense that the scope was continuously at production; the regression-and-recovery is visible in the cert artifact.
Ships in v0.1 (vocabulary, forward-compat data accumulation):
- Vocabulary:
rtm:lifecycleStage,rtm:LifecycleStage, the six INCOSE/ISO 15288 stage IRIs (concept,development,production,utilization,support,retirement),rtm:lifecycleStageRecordedAt,rtm:lifecycleStageTransition,rtm:LifecycleStageTransition,rtm:fromStage,rtm:toStage. - SHACL shape that requires
rtm:Scopeinstances to declare a lifecycle stage (warning by default; error under--profile=lifecycle-stages-required). - v0.1 oracle reads the stage and includes it in transcript provenance — but does NOT yet apply stage-aware gate relaxation or auto-rerun logic.
- Commit-metadata round-trip for
rtm:lifecycleStageper Storage Layer Flexo Conventions F4. - INCOSE alignment via
skos:closeMatchfromrtm:stage/*IRIs to INCOSE handbook stage IRIs (per INCOSE V2 Review adoption pattern).
Ships in v0.2 (mechanism):
- Stage-aware gate relaxation (the T-code blocking-vs-informational matrix above).
- Lifecycle state machine: transition rules, fall-back triggers, auto-rerunnable detection via transcript-replay dispatch.
- Re-cert prompts in the operational-layer skill.
- Cross-scope dependency cascade.
- SHACL profile
lifecycle-stage-transition-attestedrequiring named-approver on everyrtm:LifecycleStageTransition.
These are the questions ADR-029 Engineering Lifecycle Stages as Scope Metadata explicitly identifies as open for v0.2:
-
Stage-transition authority. Who can move a scope from one stage to another? Likely a named-approver attestation with
rtm:lifecycleStageTransitionsemantics analogous to other attestations — the policy primitives in Identity Boundaries and Policy Projections (rtm:permitsAttestationType,rtm:withinScope) can govern who is authorized to transition which scopes, but the exact policy shape is to be decided. - Stage-gate relaxation specifics. The matrix above is a sketch; programs may want finer-grained control. Should T1 / T2 be relaxed only for non-safety aspects at Concept stage? Should T3 / T4 / T5 always be informational at Concept regardless of their profile activation? The defaults are settled in v0.2.
- Reproducibility-machinery auto-rerun semantics. Exact replay protocol for stage-aware re-evaluation. Per-fact auto-rerun is straightforward (canonical inputs unchanged ⇒ result hash unchanged); cascade across facts where one is auto-rerunnable and a dependent requires manual re-attestation needs careful sequencing.
- Cross-scope dependencies. When a downstream scope depends on an upstream scope's certification, lifecycle-aware regression must cascade. How is the dependency declared? (Likely via the scope-algebra composition operators in Analysis Layer Scope Algebra.) How does the cascade interact with Federated Audit and Composition composition attestations? (Composition attestations on a composed scope must fall back if any constituent scope falls back, or carry an explicit attestation that the constituent change is irrelevant.)
- Stage skew across federated parties. If different parties to a federated audit are at different stage perceptions for the same scope, whose perception governs? The on-record stage is the one recorded in the scope's metadata at the audited commit; differing federated-audit attestations against different commits naturally carry different stages.
-
Analysis Layer Scope Algebra —
rtm:Scopeas a first-class RDF resource; the subject ofrtm:lifecycleStage. - Verifiable Self-Certification — the structural-locality property the auto-rerun path exercises.
- Operational Layer UX Discipline — the skill that surfaces re-cert prompts on commit (v0.2).
- Storage Layer Flexo Conventions — commit-metadata round-trip for lifecycle stage (F4).
- Aspect Coverage with Adequacy and Sufficiency — the adequacy/sufficiency criteria that drive re-cert prompts when guidance changes.
- Transcript Replay Semantics — the per-fact replay path the auto-rerun handler dispatches over.
-
INCOSE V2 Review — the source for the six INCOSE handbook stages aligned via
skos:closeMatch. - Gap Taxonomy — the T-codes whose blocking-vs-informational severity is stage-aware in v0.2.
- Federated Audit and Composition — the v0.1 federated-audit primitive lifecycle composition attestations integrate with.
- Topological Framework Future Work — the research-phase deferred framework, distinct in timeline from this v0.2 roadmap item.
- Design Spec §5 (Three-Layer Architecture and scope semantics), §9.A.1 F4 (scope metadata round-trip).
- ADR-029 Engineering Lifecycle Stages as Scope Metadata — locked decision behind this page.
- Flexo Git Coexistence
- ADCS Prototype Lessons
- MVC Pattern from RIME TRL ANT
- Human-AI Accountability
- Multi-Agent Discourse Graph Precedent
- OSLC RM and QM Review
- INCOSE V2 Review
- OMG SysMLv2
- PROV EARL GSN P-PLAN
- Dragon Architecture and Mission Enterprise
- Traditional Forward and Backward Analysis
- Attestation Infrastructure in v0.1
- Identity Boundaries and Policy Projections
- External URI References
- Signed Envelopes and Established Standards
- Aspect Coverage with Adequacy and Sufficiency
- Federated Audit and Composition
- Certification Predicate
- Gap Taxonomy
- Quantitative Outcomes
- Engineering Lifecycle Stages (v0.2)
- Topological Framework Future Work (research phase)
- Vertices Edges Faces (research phase)
- Three-Layer Architecture
- Operational Layer UX Discipline
- Storage Layer Flexo Conventions
- Analysis Layer Scope Algebra
- OSLC Roundtrip Acceptance
- Identity Adapter Contract
- Flexo REST Binding
- SysMLv2 Ingestion Contract
- External URI Rules
- Signed Envelope Shapes
- Parsimony Manifest
- Lossless Roundtrip Definition
- Vendor Extension Carry-Through
- OSLC RM Adapter Contract
- OSLC QM Adapter Contract
- ADR Template
- ADR-001 Foundations First Approach
- ADR-002 SysMLv2 Anchoring
- ADR-003 Topological Framework Documented as Future Work
- ADR-003a v0.1 Ships Traditional Analysis Only
- ADR-004 Quantitative Certification Outcome
- ADR-005 Adequacy and Sufficiency as Guidance Subtypes
- ADR-006 Three-Layer Architecture
- ADR-007 Scope as First-Class RDF Resource
- ADR-008 Repo Name and Org Transfer Plan
- ADR-009 Two-Repo Strategy
- ADR-010 OSLC-RM and OSLC-QM in v0.1
- ADR-011 Lossless Criterion A plus C
- ADR-012 Direct RDF Properties over Reified Edges
- ADR-013 Simplicial Complex as Derived View When Built
- ADR-014 Parsimony Layer Build-Time Extraction
- ADR-015 GSN Adoption for Adequacy and Sufficiency
- ADR-016 Composable SHACL Profiles
- ADR-017 knowledgecomplex as Optional Extras
- ADR-018 V minus F Invariant Deferred with Topological Framework
- ADR-019 Derived Binary View from Quantitative Metrics
- ADR-020 Vocabulary Alignment with Zargham 2026
- ADR-021 Three Attestation Subclasses Ship in v0.1
- ADR-022 External URI References as Open-Source Foundation
- ADR-023 Cryptography by Composition of Battle-Tested Standards
- ADR-024 Identity by Thin Projection of External Sources
- ADR-025 Reproducibility is Structural and Local
- ADR-026 Cryptographic Agility via Algorithm Profiles
- ADR-027 Bit-Exactness vs Numerical Tolerances Are Both First-Class
- ADR-028 Scope-Level Adequacy and Sufficiency for Federated Audit
- ADR-029 Engineering Lifecycle Stages as Scope Metadata
- ADR-030 Polycentric ASOT Authority Model
- ADR-031 Attestation Status Pass Fail Deferred Deprecated
- ADR-032 Methodology Agnosticism as Foundational Axiom
- ADR-033 Generalized ASOT Principle for All Identified Things