Repository navigation
Feature request: configurable frequency range limits for regulatory / amateur radio compliance #3725
bartoszp1992
started this conversation in
Ideas
Replies: 2 comments 9 replies
|
This is more important now that new products cannot get FCC certification due to the current administration regulations preventing new foreign-produced UAS components from getting FCC certifications. Amateur radio devices do not require FCC certification as long as they stay within the proper bands, however the current ELRS 2.4GHz band goes slightly above the amateur band. Note that the amateur rules limit RF power for "remote control" to 1W max, but the FCC generally considers the AVERAGE power output and not the peak output, so frequency hopping devices can usually operate at much higher power outputs. |
9 replies
|
That freaking suck because even people who doesn't even fly much farther just los is effected. That sucks. |
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Would it be possible to add an option to limit the frequency range used by ExpressLRS FHSS?
This would be useful for licensed amateur radio operators who may legally use higher transmit power, provided that all transmissions stay within the frequencies allowed by their licence and local band plan.
For example, in IARU Region 1 an operator may want to restrict 2.4 GHz ExpressLRS operation to 2300–2450 MHz, so the entire hopping sequence remains inside that range.
For example, I live in Europe and, in theory, as a licensed amateur radio operator I can legally use higher transmit power. However, I am still effectively limited to the CE LBT domain because there is currently no way to control or restrict the frequency range used by ExpressLRS.
A simple min_frequency / max_frequency build option, or a predefined amateur-radio frequency domain, could solve this.
The firmware could also verify that enough hopping channels remain available for reliable operation.
The intention is not to bypass regional RF regulations, but to allow licensed operators to keep ExpressLRS operation within the band covered by their amateur radio licence while using permitted higher power.
All reactions