Skip to content

GEOS 5 Timings

Matthew Thompson edited this page Sep 26, 2025 · 2 revisions

title: GEOS-5 Timings last_updated: 2017-01-09T18:14:12+00:00

All timings are for a one day run setup by running the gcm_setup script, with the Merra 2 ocean and Merra 2 gocart. The compiler, mpi stack etc ... and baselibs are the default for the particular model tag.

Heracles-4_0

Heracles-4_0 c180

NX: 6 NY: 36

Component

Run Method Time (minutes)

GCS

9.35

HISTORY

0.50

EXTDATA

0.00

DYNAMICS

3.72

PHYSICS

5.27

RADIATION

1.40

MOIST

0.88

SURFACE

0.88

CHEMISTRY

1.77

Heracles-4_2

Heracles-4_2 c180

NX: 6 NY: 36

Component

Run Method Time (minutes)

GCS

9.20

HISTORY

0.53

EXTDATA

0.08

DYNAMICS

3.90

PHYSICS

5.07

RADIATION

1.38

MOIST

0.96

SURFACE

0.90

CHEMISTRY

1.51

Heracles-4_3

Heracles-4_3 c180

NX: 6 NY: 36

Component

Run Method Time (minutes)

GCS

9.30

HISTORY

0.64

EXTDATA

0.16

DYNAMICS

4.02

PHYSICS

5.07

RADIATION

1.39

MOIST

0.96

SURFACE

0.98

CHEMISTRY

1.43

Heracles-5_0

Heracles-5_0 c180

NX: 6 NY: 36

Component

Run Method Time (minutes)

GCS

12.11

HISTORY

0.53

EXTDATA

0.22

DYNAMICS

4.07

PHYSICS

7.86

RADIATION

1.55

MOIST

3.90

SURFACE

0.91

CHEMISTRY

3.68

Heracles-5_1

Heracles-5_1 c180

NX: 6 NY: 36

Component

Run Method Time (minutes)

GCS

12.04

HISTORY

0.53

EXTDATA

0.24

DYNAMICS

4.00

PHYSICS

7.85

RADIATION

1.56

MOIST

3.89

SURFACE

0.90

CHEMISTRY

3.68

Clone this wiki locally