User Story
As a guild owner or guild admin, I need to manage the manufacturing keepalive schedule so that the bot refreshes or maintains manufacturing workflow artifacts on the cadence my guild expects.
Definition of Done
Acceptance Criteria
- A guild admin can update the manufacturing keepalive schedule from Station
- Invalid schedules are rejected with field-level validation
- The saved schedule persists on reload
Technical Elaboration
This ticket isolates the manufacturingKeepaliveCronSchedule configuration because it is operationally distinct from content, limits, and enablement.
Design Elaboration
This UI should feel schedule-centric and should clearly communicate timezone/scheduler expectations if those are exposed elsewhere in the product.
Parent Epic: #231
Depends on: #232, #233, #242
User Story
As a guild owner or guild admin, I need to manage the manufacturing keepalive schedule so that the bot refreshes or maintains manufacturing workflow artifacts on the cadence my guild expects.
Definition of Done
manufacturingKeepaliveCronSchedulepnpm typecheckpassesAcceptance Criteria
Technical Elaboration
This ticket isolates the
manufacturingKeepaliveCronScheduleconfiguration because it is operationally distinct from content, limits, and enablement.Design Elaboration
This UI should feel schedule-centric and should clearly communicate timezone/scheduler expectations if those are exposed elsewhere in the product.
Parent Epic: #231
Depends on: #232, #233, #242