Skip to content

Update geom_run1_b_v03: extend DS2Vacuum for tracker, disable service…#1745

Merged
oksuzian merged 1 commit intoMu2e:Run1Bfrom
oksuzian:add-geom-run1b-v03-run1b
Feb 25, 2026
Merged

Update geom_run1_b_v03: extend DS2Vacuum for tracker, disable service…#1745
oksuzian merged 1 commit intoMu2e:Run1Bfrom
oksuzian:add-geom-run1b-v03-run1b

Conversation

@oksuzian
Copy link
Collaborator

… pipes

@FNALbuild
Copy link
Collaborator

Hi @oksuzian,
You have proposed changes to files in these packages:

  • Mu2eG4

which require these tests: build.

@Mu2e/write have access to CI actions on Run1B.

⌛ The following tests have been triggered for 2524322: build (Build queue - API unavailable)

About FNALbuild. Code review on Mu2e/Offline.

@oksuzian oksuzian merged commit f4fb0cd into Mu2e:Run1B Feb 25, 2026
2 of 3 checks passed
@FNALbuild
Copy link
Collaborator

☀️ The build tests passed at 2524322.

Test Result Details
test with Command did not list any other PRs to include
merge Merged 2524322 at 00e7f25
build (prof) Log file. Build time: 04 min 11 sec
ceSimReco Log file.
g4test_03MT Log file.
transportOnly Log file.
POT Log file.
g4study Log file.
cosmicSimReco Log file.
cosmicOffSpill Log file.
ceSteps Log file.
ceDigi Log file.
muDauSteps Log file.
ceMix Log file.
rootOverlaps Log file.
g4surfaceCheck Log file.
trigger Log file. Return Code 2.
check_cmake Log file.
FIXME, TODO TODO (0) FIXME (0) in 0 files
clang-tidy 0 errors 0 warnings
whitespace check no whitespace errors found

N.B. These results were obtained from a build of this Pull Request at 2524322 after being merged into the base branch at 00e7f25.

For more information, please check the job page here.
Build artifacts are deleted after 5 days. If this is not desired, select Keep this build forever on the job page.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants