-
Notifications
You must be signed in to change notification settings - Fork 53
20. Allowance of checks
paulakeen edited this page May 3, 2017
·
1 revision
Related to the criterion "Allowance of checks", included in Part IV (Selection criteria) section C (Technical and professional ability) of the ESPD, the CA will be able to add as many requirements as needed. The specific requirements will depend on the particular needs of the procurement procedure.
In the ESPDResponse the EO will need to provide and answer (YES/NO) for each requirement.
-
View of the CA:
-
View of the EO:
ESPD-EDM UML Data Model
Specifications
Additional Tools
Archive:
see more
- 1. General Turnover
- 2. Specific Turnover
- 3. Financial Ratios
- 4. Weighting
- 5. EO roles
- 6. Information about publication
- 7. Pre qualification systems and classification of EOs
- 8. References on similar works, deliveries or services
- 9. Lots management *10. Payments of Taxes and Social Security
- 11. Confidentiality
- 12. Part IV: Selection criteria, Section A: Suitability
- 13. Purely National exclusion grounds
- 14. Quality assurance schemes and environmental management standards
- 15. Information about SMEs
- 16. Professional risk indemnity insurance
- 17. Other economic or financial requirements
- 18. Technicians or technical bodies
- 19. Supply chain management
- 20. Allowance of checks
- 21. Educational and professional qualifications and Environmental management measures
- 22. Tools, plant or technical equipment
- 23. Criteria for a particular type of contract
- 24. Regulated ESPD vs Self contained ESPD
- 25. Technical, Study, Research and Development facilities resources