9. Lots management
The CA provides de number of lots the procurement procedure is divided into in Part I of the ESPDRequest.
The CA provides, for each criteria in Part IV of the ESPDRequest, the specific requirements and the set of lots these requirements apply to. By default, all specific requirements will apply to all lots, so the CA must only select the lots for requirements that apply only to particular lots.
The EO provides the lots for which the economic operator wishes to tender in Part II of the ESPDResponse.
When the EO relies on the capacities of other entities in order to meet the selection criteria, the EO must provide the lots for each entity in Part II of the ESPDResponse.
In Part IV of the ESPDResponse, the system will display the specific requirements that apply to each lot, and the EO will be able to provide information for specific lots.
- View of the CA:
(Part I)
(Part IV)
- View of the EO:
(Part II)
(Part II, only when the EO relies on the capacities of other entities in order to meet the selection criteria for one or several lots)
(Part IV)
ESPD-EDM UML Data Model
Specifications
Additional Tools
Archive:
see more
- 1. General Turnover
- 2. Specific Turnover
- 3. Financial Ratios
- 4. Weighting
- 5. EO roles
- 6. Information about publication
- 7. Pre qualification systems and classification of EOs
- 8. References on similar works, deliveries or services
- 9. Lots management *10. Payments of Taxes and Social Security
- 11. Confidentiality
- 12. Part IV: Selection criteria, Section A: Suitability
- 13. Purely National exclusion grounds
- 14. Quality assurance schemes and environmental management standards
- 15. Information about SMEs
- 16. Professional risk indemnity insurance
- 17. Other economic or financial requirements
- 18. Technicians or technical bodies
- 19. Supply chain management
- 20. Allowance of checks
- 21. Educational and professional qualifications and Environmental management measures
- 22. Tools, plant or technical equipment
- 23. Criteria for a particular type of contract
- 24. Regulated ESPD vs Self contained ESPD
- 25. Technical, Study, Research and Development facilities resources