Sprint 3

Deliverable Statement:

During this sprint, we will continue setting up and securing the industrial control system (ICS) network by configuring the HMIs and power supplies.

Objectives:

  • Set up HMIs: The team also set up all required Human-Machine Interfaces (HMIs) during Sprint 2. These interfaces will provide operators with an easy-to-use way to monitor and control the ICS system.

  • Set up power supplies: In order to ensure the ICS system can operate consistently and without interruption, the team also set up all necessary power supplies during Sprint 3. These power supplies will provide the necessary electrical power to all devices and components within the system.

Outcomes:

During this sprint, we successfully configured and secured the HMIs and power supplies. We also conducted a thorough vulnerability assessment of the ICS network, identifying and addressing potential security risks.

Discrete Tasks: