A structured record of the project’s requirements, generated concepts, evaluation and product architecture.
| Project boundary | Source requirement |
|---|---|
| Maximum overall cost | ₹5,000 |
| Maximum clock volume | 1.5 m³ |
| Core functions | Display accurate time and day/date; allow adjustment and user settings; provide an alarm or alert |
The chapter order follows the engineering worksheet outline. The worksheet section pages are linked below. Workbook content and original diagrams were retrieved on 7 October 2026; this Wiki is a published snapshot.
- 00. ED Worksheet
- 01.TEAM INTRODUCTION
- 02.GATHERING PERTINENT INFORMATION
- 03.PROBLEM DEFINITION
- 4. CONCEPT GENERATION
- 5. CONCEPT EVALUATION AND PRODUCT ARCHITECTURE
- Appendix — Bill of Materials and Source Notes
Evaluation status: The pendulum/escapement alternative has the highest recorded Pugh total (+18). The source does not contain final selection approval, and its concept matrix, Pugh alternatives and justification groups use different design sets. These differences are identified in the relevant chapters.