Skip to content

Configure settings and validate complete system #7

@t3chn

Description

@t3chn

Task: Configure settings and validate complete system

Description

Configure Claude Code hook system for logging, ensure all script permissions are correct, and perform comprehensive end-to-end testing of the complete hardening system.

Acceptance Criteria

  • Add hooks.PreToolUse configuration to .claude/settings.json
  • Verify all shell scripts have executable permissions (chmod +x)
  • Create required directories: .claude/locks/, .claude/logs/
  • Test complete validation workflow with invalid frontmatter
  • Test concurrent issue locking with multiple sessions
  • Test rate limit handling with forced low GitHub API limits
  • Verify NDJSON logging is working and properly formatted
  • Test rollback procedure (disable hooks and integration)
  • Document installation and configuration steps
  • Validate performance impact is within acceptable limits

Technical Details

Implementation approach:

  • Update or create .claude/settings.json with hook configuration
  • Run comprehensive test scenarios covering all integration points
  • Measure performance impact on typical operations
  • Document setup and rollback procedures

Key considerations:

  • Hook configuration must not break existing Claude Code functionality
  • All integration points must work together seamlessly
  • Performance impact must be minimal (< 2 seconds added to operations)
  • System must be easily reversible for rollback

Code locations/files affected:

  • Modify: .claude/settings.json (hook configuration)
  • Create: .claude/locks/ directory
  • Create: .claude/logs/ directory
  • Verify: All scripts in .claude/scripts/pm/ have +x permissions
  • Verify: Hook script in .claude/hooks/ has +x permissions

Dependencies

  • Task 004: Hook logging system must be implemented
  • Task 005: PM command integration must be completed
  • All core scripts (001-003) must be working
  • Access to GitHub API for end-to-end testing
  • Multiple shell sessions for concurrent testing

Effort Estimate

  • Size: S
  • Hours: 1.5 hours
  • Parallel: false (final integration and testing phase)

Definition of Done

  • settings.json properly configured with hook system
  • All required directories created with proper permissions
  • All shell scripts executable and working
  • End-to-end testing completed for all major scenarios
  • Performance impact measured and within acceptable limits
  • Rollback procedure tested and documented
  • Installation documentation created
  • System ready for production use with all hardening features active

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions