Skip to content

Conversation

@myakove
Copy link
Collaborator

@myakove myakove commented Dec 28, 2023

  • Remove timeout sampler tests
  • Remove pre-commit from tox

@myakove
Copy link
Collaborator Author

myakove commented Dec 28, 2023

/verified

@redhat-qe-bot
Copy link
Contributor

Report bugs in Issues

The following are automatically added:

  • Add reviewers from OWNER file (in the root of the repository) under reviewers section.
  • Set PR size label.
  • New issue is created for the PR. (Closed when PR is merged/closed)
  • Run pre-commit if .pre-commit-config.yaml exists in the repo.

Available user actions:

  • To mark PR as WIP comment /wip to the PR, To remove it from the PR comment /wip cancel to the PR.
  • To block merging of PR comment /hold, To un-block merging of PR comment /hold cancel.
  • To mark PR as verified comment /verified to the PR, to un-verify comment /verified cancel to the PR.
    verified label removed on each new commit push.
  • To cherry pick a merged PR comment /cherry-pick <target branch to cherry-pick to> in the PR.
    • Multiple target branches can be cherry-picked, separated by spaces. (/cherry-pick branch1 branch2)
    • Cherry-pick will be started when PR is merged
  • To build and push container image command /build-and-push-container in the PR (tag will be the PR number).
  • To add a label by comment use /<label name>, to remove, use /<label name> cancel
Supported /retest check runs
  • /retest tox: Retest tox
  • /retest sonarqube: Retest sonarqube
  • /retest python-module-install: Retest python-module-install
Supported labels
  • hold
  • verified
  • wip
  • lgtm

@myakove
Copy link
Collaborator Author

myakove commented Dec 28, 2023

/verified

Copy link
Collaborator

@rnetser rnetser left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

@myakove
Copy link
Collaborator Author

myakove commented Dec 31, 2023

@rnetser I removed unittests folder completely

@myakove
Copy link
Collaborator Author

myakove commented Dec 31, 2023

/verified

@myakove myakove removed the verified label Dec 31, 2023
@myakove
Copy link
Collaborator Author

myakove commented Dec 31, 2023

/verified

@myakove
Copy link
Collaborator Author

myakove commented Dec 31, 2023

/verified

@myakove
Copy link
Collaborator Author

myakove commented Jan 1, 2024

/verified

@rnetser
Copy link
Collaborator

rnetser commented Jan 1, 2024

/verified

@rnetser
Copy link
Collaborator

rnetser commented Jan 1, 2024

/lgtm

@redhat-qe-bot redhat-qe-bot requested a review from rnetser January 1, 2024 07:54
@rnetser rnetser enabled auto-merge (squash) January 1, 2024 07:54
@rnetser
Copy link
Collaborator

rnetser commented Jan 1, 2024

/verified

@rnetser rnetser merged commit ae9461e into main Jan 1, 2024
@rnetser rnetser deleted the timeout-sampler-remove-tests branch January 1, 2024 07:55
myakove added a commit that referenced this pull request Aug 11, 2025
Co-authored-by: Ruth Netser <rnetser@redhat.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants