Skip to content

[pre-commit.ci] pre-commit autoupdate#239

Merged
redhat-qe-bot2 merged 1 commit into
mainfrom
pre-commit-ci-update-config
Jul 9, 2024
Merged

[pre-commit.ci] pre-commit autoupdate#239
redhat-qe-bot2 merged 1 commit into
mainfrom
pre-commit-ci-update-config

Conversation

@pre-commit-ci

@pre-commit-ci pre-commit-ci Bot commented Jul 8, 2024

Copy link
Copy Markdown
Contributor

updates:
- [github.com/astral-sh/ruff-pre-commit: v0.5.0 → v0.5.1](astral-sh/ruff-pre-commit@v0.5.0...v0.5.1)
@sonarqubecloud

sonarqubecloud Bot commented Jul 8, 2024

Copy link
Copy Markdown

@redhat-qe-bot2

Copy link
Copy Markdown

Report bugs in Issues

The following are automatically added:

  • Add reviewers from OWNER file (in the root of the repository) under reviewers section.
  • Set PR size label.
  • New issue is created for the PR. (Closed when PR is merged/closed)
  • Run pre-commit if .pre-commit-config.yaml exists in the repo.

Available user actions:

  • To mark PR as WIP comment /wip to the PR, To remove it from the PR comment /wip cancel to the PR.
  • To block merging of PR comment /hold, To un-block merging of PR comment /hold cancel.
  • To mark PR as verified comment /verified to the PR, to un-verify comment /verified cancel to the PR.
    verified label removed on each new commit push.
  • To cherry pick a merged PR comment /cherry-pick <target branch to cherry-pick to> in the PR.
    • Multiple target branches can be cherry-picked, separated by spaces. (/cherry-pick branch1 branch2)
    • Cherry-pick will be started when PR is merged
  • To build and push container image command /build-and-push-container in the PR (tag will be the PR number).
  • To add a label by comment use /<label name>, to remove, use /<label name> cancel
  • To assign reviewers based on OWNERS file use /assign-reviewers
  • To check if PR can be merged use /check-can-merge
Supported /retest check runs
  • /retest tox: Retest tox
  • /retest python-module-install: Retest python-module-install
Supported labels
  • hold
  • verified
  • wip
  • lgtm

@myakove

myakove commented Jul 9, 2024

Copy link
Copy Markdown
Collaborator

/lgtm

@redhat-qe-bot2

Copy link
Copy Markdown

Owner of the pull request pre-commit-ci[bot] is part of:
['renovate[bot]', 'pre-commit-ci[bot]', 'redhat-qe-bot', 'redhat-qe-bot1', 'redhat-qe-bot2', 'msi-b1']
Pull request is merged automatically.

@redhat-qe-bot2 redhat-qe-bot2 merged commit 5156376 into main Jul 9, 2024
@redhat-qe-bot2 redhat-qe-bot2 deleted the pre-commit-ci-update-config branch July 9, 2024 06:54
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants