docs(plan): Phase 4 productization — Stripe + amispoof decision + sequencing (DT-5)#55

Merged
ahmetabdullahgultekin merged 1 commit into
mainfrom
docs/phase-4-productization-plan
May 11, 2026
Merged

docs(plan): Phase 4 productization — Stripe + amispoof decision + sequencing (DT-5)#55
ahmetabdullahgultekin merged 1 commit into
mainfrom
docs/phase-4-productization-plan

Conversation

@ahmetabdullahgultekin

Copy link
Copy Markdown
Contributor

Summary

  • Consolidated Phase 4 productization plan at PHASE_4_PRODUCTIZATION_PLAN_2026-05-11.md (492 lines) covering Stripe integration sub-phases (4.1 operator KYC → 4.5 status-page wiring), amispoof.com decision (defer per Option B), BYOD sequencing (gated post-Phase-4.4), trigger criteria, risk register, and operator action checklist.
  • Stripe scaffold spec is DX-first: tenant signup → Stripe Checkout → dashboard billing tab → 402 contract on suspended subscriptions. Backend = StripeService port + StripeAdapter infrastructure + WebhookController + SubscriptionFilter + V61 migration. Frontend = useStripeCheckout + PlanSelector + BillingSettingsPage + i18n keys (no hardcoded strings).
  • Recommendation: adopt BAAS_RENTAL_MODEL.md pricing verbatim for v1, iterate after first 10 paying tenants give real elasticity data.
  • amispoof.com: defer (spoof-detector repo already serves as canonical demo; paper push has higher leverage). 1-day short path documented if reversed.
  • BYOD: book at earliest Phase 6, conditional on Phase 4.4 GA + first enterprise lead.

Scope guardrails

  • No code changed. This is the planning artifact. Per feedback_ask_before_acting.md and feedback_dx_first_planning.md, agent waits for explicit approval before Phase 4.3 scaffolding.
  • Hard blockers: Stripe account active + DPIA addendum for billing data.
  • Soft recommendations: warm tenant lead in pipeline + BYOD schema placeholder columns in V61 (optional flag).

Test plan

  • Maintainer reviews against BAAS_RENTAL_MODEL.md, BYOD_ARCHITECTURE.md, RESEARCH_PROCTORING_AMISPOOF_2026-05-02.md, infra/OPERATOR_HANDOFF_2026-05-11.md §4 + §7 for fidelity.
  • Maintainer confirms or comments on pricing-adopt-verbatim recommendation.
  • Maintainer confirms or rejects amispoof.com defer recommendation.
  • On approval: operator opens follow-up issue titled Phase 4.3 dispatch — Stripe scaffolding once Stripe KYC clears, triggering agent work.

🤖 Generated with Claude Code

…uencing (DT-5)

Consolidated planning doc covering:
- Phase 4.1-4.5 Stripe integration (operator KYC + V61 + StripeService/Adapter + Checkout flow + status-page wiring)
- amispoof.com decision: defer per RESEARCH_PROCTORING_AMISPOOF_2026-05-02.md Option B; 1-day short path if reversed
- BYOD architecture sequencing: gated on Phase 4.4 complete + first enterprise lead
- Trigger criteria (operator + code + process gates)
- Risk register + operator action checklist

No code changed — planning artifact only. Awaits user approval before
Phase 4.3 agent scaffolding starts.

Sources consolidated: docs/plans/BAAS_RENTAL_MODEL.md, docs/plans/BYOD_ARCHITECTURE.md,
RESEARCH_PROCTORING_AMISPOOF_2026-05-02.md, infra/OPERATOR_HANDOFF_2026-05-11.md §4+§7,
ROADMAP.md.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Copilot AI review requested due to automatic review settings May 11, 2026 07:56
@ahmetabdullahgultekin ahmetabdullahgultekin merged commit d2ad5c4 into main May 11, 2026
4 of 5 checks passed
@ahmetabdullahgultekin ahmetabdullahgultekin deleted the docs/phase-4-productization-plan branch May 11, 2026 08:00
@ahmetabdullahgultekin ahmetabdullahgultekin removed the request for review from Copilot May 11, 2026 08:18
ahmetabdullahgultekin added a commit that referenced this pull request May 11, 2026
…uencing (DT-5) (#55) (#56)

Consolidated planning doc covering:
- Phase 4.1-4.5 Stripe integration (operator KYC + V61 + StripeService/Adapter + Checkout flow + status-page wiring)
- amispoof.com decision: defer per RESEARCH_PROCTORING_AMISPOOF_2026-05-02.md Option B; 1-day short path if reversed
- BYOD architecture sequencing: gated on Phase 4.4 complete + first enterprise lead
- Trigger criteria (operator + code + process gates)
- Risk register + operator action checklist

No code changed — planning artifact only. Awaits user approval before
Phase 4.3 agent scaffolding starts.

Sources consolidated: docs/plans/BAAS_RENTAL_MODEL.md, docs/plans/BYOD_ARCHITECTURE.md,
RESEARCH_PROCTORING_AMISPOOF_2026-05-02.md, infra/OPERATOR_HANDOFF_2026-05-11.md §4+§7,
ROADMAP.md.

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant