Skip to content

docs(planning): Phase 11 GREEN — post-flip artifacts#6

Merged
Roo4L merged 1 commit into
masterfrom
agent/claude-code/5b93ad3c-postflip
Apr 26, 2026
Merged

docs(planning): Phase 11 GREEN — post-flip artifacts#6
Roo4L merged 1 commit into
masterfrom
agent/claude-code/5b93ad3c-postflip

Conversation

@Roo4L
Copy link
Copy Markdown
Owner

@Roo4L Roo4L commented Apr 26, 2026

Follow-up to PR #3. Captures the post-flip evidence:

  • PUB-03 post-flip smoke transcript
  • PUB-04 release-notes pointer
  • CIPUB-03 Option-A verification JSON
  • Phase 11 AUDIT.md flipped to GATE: GREEN

🤖 Generated with Claude Code

… captured

The v0.4.0 milestone is shipped:

- PUB-02: visibility flipped at 2026-04-26T15:30Z; verified PUBLIC.
- PUB-03: post-flip smoke ran from /tmp/postflip-smoke (anonymous clone +
  raw curl-installer fetch + SHA-match + bash -n syntax check all green);
  evidence in docs/audits/v0.4.0/PUB-03-postflip-smoke.md. End-to-end
  curl|bash install deferred to v0.3.0 final release event (per the
  milestone plan; v0.4.0's deliverable is the flip itself).
- PUB-04: GitHub Release page exists at v0.4.0 (metadata-only, no tarball,
  release.yml's tag-triggered run cancelled); pointer doc at
  docs/audits/v0.4.0/PUB-04-release-notes.md.
- Branch protection re-applied as Option A (with gitleaks context): see
  CIPUB-03-applied-A.json for verification JSON.

Phase 11 AUDIT updated to GATE: GREEN. Milestone is ready for
/gsd-complete-milestone v0.4.0.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@Roo4L Roo4L merged commit 00ed64d into master Apr 26, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant