hot fix fcl to run reco1 w/ dnn roi#828
Conversation
… process sequence
|
trigger build ci_ref=v10_10_02 LArSoft/lar*@LARSOFT_SUITE_v10_10_03 SBNSoftware/sbndaq_artdaq_core@v1_10_06 SBNSoftware/sbnd_data@v01_36_00 |
|
✔️ CI build for LArSoft Succeeded on slf7 for c14:prof -- details available through the CI dashboard |
|
✔️ CI build for LArSoft Succeeded on slf7 for e26:prof -- details available through the CI dashboard |
|
❌ CI build for SBND Failed at phase build SBND on slf7 for c14:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build SBND phase logs parent CI build details are available through the CI dashboard |
|
🚨 For more details about the warning phase, check the ci_tests SBND phase logs parent CI build details are available through the CI dashboard |
|
Approved |
Description
One fcl to run reco1 w/ dnn roi. The planned sp both rois + no sp workflow needs fix in the reco1 process sequence which involves validation and also is difficult to maintain.
Checklist
Reviewers,AssigneesDevelopementRelevant PR links (optional)
Does this PR require merging another PR in a different repository (such as sbnanobj/sbnobj etc.)?
Link(s) to docdb describing changes (optional)
Is there a docdb describing the issue this solves or the feature added?