Skip to content
Rick Hightower edited this page Aug 1, 2026 · 2 revisions

PR #9

pr/9 · status: not tracked

Changed files: not tracked. Test/Review status: not tracked (see the deferred PR live-metadata sync item).

Linked Tickets

  • Ticket-01KYZNNM1XEWFFN01EE60THRXK Regenerate stale IA index so the doc gates stop warning — The doc-metadata, inventory, and rendered-page gates had drifted two days behind the work log and warned on every commit, with the message saying they become a hard gate soon.
  • Ticket-01KYZNNMGDBGN01Z83896Q4J8H Clear ticket sync keys left pointing at the old repository — After the move to the SpillwaveSolutions org, the ticket sync state still mapped six work items to issue numbers 1-6.
  • Ticket-01KYZNNMWG2ZHJV4YRKPJX0DZE Tell agents to verify their worktree base before building — A parallel agent was given an isolated worktree cut from the default branch rather than the feature branch it was told to build on, so the work it depended on was absent.

Related Releases

Clone this wiki locally