9/19/24 Progress Report 2 #32
TelloViz
announced in
Announcements
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
Team 8: Card Collection
Date: September 19, 2024
Tasks Finished
- Presented introduction and description of the project to the class.
- Met with Josh to iron out the details of the problem we are solving, including the Minimum Viable Product.
- Reviewed the Software, Languages, and Frameworks that will be used for the project.
- Prototyped rudimentary application.
- Further fleshed out PowerPoint, GitHub repo, and discussion/project boards.
- Met with Christian to iron out the details of the problem we are solving, including the Minimum Viable Product.
Tasks In-Progress
- Obtain API and IDE licenses.
- Get acquainted with API/Python.
- Installing QT Creator, QT Designer, and PokemonTCG API.
- Installing Python3 and trying out API in python3 interpreter.
- Writing this post, and setting up some tutorials for Christian to get the framework, API, Python, and IDE setup.
- Designing UI and prototyping backend.
Upcoming
All reactions