Add Launch Readiness Gate

github-actions[bot] edited this page Jun 16, 2026 · 1 revision

How to run a pre-launch readiness gate with /launch

Important

Status: implemented/launch shipped in src/developer-workflows/commands/launch.md.

Note

Goal: Gate a first production rollout with a structured readiness checklist — observability wired, rollback tested, feature flag off-switch confirmed, staged rollout plan written — using the /launch command before any production users see the feature. Prereqs: the developer-workflows plugin installed (Install crickets plugins); a feature ready for first production exposure; observability instrumented (see /observe).

/launch is the first-production-rollout gate; it is distinct from /release (which is the pre-merge code gate). /launch enforces:

  1. Observability is wired (logs, metrics, alerts live).
  2. Rollback has been tested and is confirmed to work.
  3. A feature flag off-switch is confirmed (the kill switch is real, not hypothetical).
  4. A staged rollout plan is written (dark launch → staged rollout → full rollout → flag removed).

Steps

  1. Invoke the command, passing the feature, diff, or PR being shipped:

    /launch <feature, diff, or PR>
    

    The argument is required. /launch is for first production exposure — not routine patches or internal tooling changes. See src/developer-workflows/commands/launch.md (When to Use) for the full boundary.

  2. Identify the launch scope: what is shipping, which users it reaches, the initial traffic percentage, the feature flag name (if any), and the deployment mechanism.

  3. Run the pre-launch checklist. Verify each item; do not check a box you cannot prove:

    Checklist item What to verify
    Observability wired RED metrics (rate, error, duration) instrumented for every new production path; structured log events at entry/exit; trace spans in place. Run /observe if not done.
    Rollback tested Rollback executed in a non-production environment. Document the exact command and measured time-to-recovery.
    Feature flag off-switch confirmed Flag can be disabled in under 5 minutes with no code change. Test it: flip off in staging, confirm behavior, flip back.
    Staged rollout plan written Names initial traffic %, ramp schedule, success criteria at each stage (error rate below X, p99 latency below Y), and responsible party per stage.
  4. Verify the feature flag lifecycle stage and advance it correctly:

    Stage What happens
    Created Flag exists; code is deployed but unreachable (flag off). Dark launch.
    Dark launch Code in production; flag off; zero user traffic. Verify observability and error budgets here.
    Staged rollout Flag on for N% of users (e.g. 1%, 5%, 25%). Monitor RED metrics; advance only on green.
    Full rollout Flag on for 100%. Monitoring confirms stable.
    Flag removed Flag and all conditional branches deleted from the codebase. Do this within one release cycle of full rollout.

    Do not skip stages. A flag going from off to 100% on launch day is not a staged rollout.

  5. Confirm monitoring is active before shipping: send a test request and verify the RED metric appears in your monitoring system; confirm symptom-based alerts are firing-ready and route to the named on-call owner.

  6. Ship with the rollout plan in hand. Advance through stages only on green metrics — not because the schedule says so.

  7. After reaching full rollout: confirm error rate and latency are within budget; confirm rollback procedure is still accessible; schedule flag removal within the next release cycle.

Verify

Work through the verification checklist from src/developer-workflows/commands/launch.md:

  • Pre-launch checklist complete: observability wired, rollback tested, flag off-switch confirmed, staged rollout plan written.
  • Rollback procedure documented and tested (not assumed); time-to-recovery measured.
  • RED metrics emitting for every new production path; confirmed in monitoring system.
  • Symptom-based alerts active and routing to the correct on-call owner.
  • Feature flag lifecycle stage is correct for this launch step.
  • Staged rollout plan names: initial %, ramp schedule, success criteria, responsible party.
  • Flag removal scheduled within the next release cycle (if now at full rollout).

Troubleshooting

Common rationalizations that signal something is wrong (from src/developer-workflows/commands/launch.md "Common Rationalizations"):

Excuse What it signals
"We'll add monitoring after launch." No baseline. First real traffic is also first signal of failure. Do not ship.
"It's a small change — no staged rollout needed." Every incident started as a "small change." The rollout plan exists for the case where you are wrong.
"The flag has been at 100% for a month — we'll remove it later." A flag never removed becomes code that branches on a constant. Remove within one release cycle.
"We tested rollback in local." Local rollback does not test the production deployment mechanism or the config system. Test in staging.