Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 0 additions & 2 deletions .github/dependabot.yml
Original file line number Diff line number Diff line change
Expand Up @@ -35,5 +35,3 @@ updates:
- dependency-name: "cpp-linter/cpp-linter-action"
versions: ">=2.16"
open-pull-requests-limit: 50
cooldown:
default: 4
18 changes: 0 additions & 18 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -8,7 +8,6 @@ This repository hosts GitHub Actions developed by the ASF community and approved
- [Adding a New Action](#adding-a-new-action-to-the-allow-list)
- [Reviewing](#reviewing)
- [Adding a New Version](#adding-a-new-version-to-the-allow-list)
- [Dependabot Cooldown Period](#dependabot-cooldown-period)
- [Manual Version Addition](#manual-addition-of-specific-versions)
- [Removing a Version](#removing-a-version-manually)

Expand Down Expand Up @@ -144,23 +143,6 @@ This will:
> **Prerequisites:** `docker`, `uv`, and `gh` (GitHub CLI, authenticated via `gh auth login`).
> The build runs in a `node:20-slim` container so no local Node.js installation is needed.

#### Dependabot Cooldown Period

This repository uses a [Dependabot cooldown period](https://docs.github.com/en/code-security/dependabot/dependabot-version-updates/configuration-options-for-the-dependabot.yml-file#cooldown) of 4 days. After a Dependabot PR is merged or closed, Dependabot will wait 4 days before opening the next PR for the same ecosystem. This helps keep the volume of update PRs manageable and gives reviewers time to catch up.

> [!TIP]
> We recommend that ASF projects configure a similar cooldown in their own `dependabot.yml` to avoid being overwhelmed by update PRs and to catch up with approved actions here:
Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

we should add this recommendation somewhere

> ```yaml
> updates:
> - package-ecosystem: "github-actions"
> directory: "/"
> schedule:
> interval: "weekly"
> cooldown:
> default: 4
> ```
> Adjust the `default` value (in days) to match your project's review capacity.

### Manual Addition of Specific Versions

If you need to add a specific version of an already approved action (especially an older one):
Expand Down
Loading