Skip to content

(experimental, do_not_merge) Move delay to dispatch loop v4#12880

Closed
spraza wants to merge 10 commits into
apple:release-7.3from
spraza:move-delay-to-dispatch-loop-v4
Closed

(experimental, do_not_merge) Move delay to dispatch loop v4#12880
spraza wants to merge 10 commits into
apple:release-7.3from
spraza:move-delay-to-dispatch-loop-v4

Conversation

@spraza
Copy link
Copy Markdown
Collaborator

@spraza spraza commented Mar 27, 2026

Same as #12879 with these additions:

  • change to 0.1 delay
  • cherry-pick some commits that were merged after 7.3.69, so that noise is reduced in simulation results

Tests running: 20260327-185233-praza-09da0926f0a9c4a1 compressed=True data_size=35184260 fail_fast=50 max_runs=500000 priority=100 sanity=False submitted=20260327-185233 timeout=5400 username=praza

Code-Reviewer Section

The general pull request guidelines can be found here.

Please check each of the following things and check all boxes before accepting a PR.

  • The PR has a description, explaining both the problem and the solution.
  • The description mentions which forms of testing were done and the testing seems reasonable.
  • Every function/class/actor that was touched is reasonably well documented.

For Release-Branches

If this PR is made against a release-branch, please also check the following:

  • This change/bugfix is a cherry-pick from the next younger branch (younger release-branch or main if this is the youngest branch)
  • There is a good reason why this PR needs to go into a release branch and this reason is documented (either in the description above or in a linked GitHub issue)

@foundationdb-ci
Copy link
Copy Markdown
Contributor

Result of foundationdb-pr-clang-arm on Linux CentOS 7

  • Commit ID: 77f46b9
  • Duration 0:04:08
  • Result: ❌ FAILED
  • Error: Error while executing command: ninja -v -C build_output -j ${NPROC} all packages strip_targets. Reason: exit status 1
  • Build Log terminal output (available for 30 days)
  • Build Workspace zip file of the working directory (available for 30 days)

@foundationdb-ci
Copy link
Copy Markdown
Contributor

Result of foundationdb-pr-cluster-tests on Linux RHEL 9

  • Commit ID: 77f46b9
  • Duration 0:08:09
  • Result: ❌ FAILED
  • Error: Error while executing command: ninja -v -C build_output -j ${NPROC} all packages strip_targets. Reason: exit status 1
  • Build Log terminal output (available for 30 days)
  • Build Workspace zip file of the working directory (available for 30 days)
  • Cluster Test Logs zip file of the test logs (available for 30 days)

@foundationdb-ci
Copy link
Copy Markdown
Contributor

Result of foundationdb-pr-clang on Linux RHEL 9

  • Commit ID: 77f46b9
  • Duration 0:08:32
  • Result: ❌ FAILED
  • Error: Error while executing command: ninja -v -C build_output -j ${NPROC} all packages strip_targets. Reason: exit status 1
  • Build Log terminal output (available for 30 days)
  • Build Workspace zip file of the working directory (available for 30 days)

@foundationdb-ci
Copy link
Copy Markdown
Contributor

Result of foundationdb-pr on Linux RHEL 9

  • Commit ID: 77f46b9
  • Duration 0:08:54
  • Result: ❌ FAILED
  • Error: Error while executing command: ninja -v -C build_output -j ${NPROC} all packages strip_targets. Reason: exit status 1
  • Build Log terminal output (available for 30 days)
  • Build Workspace zip file of the working directory (available for 30 days)

@foundationdb-ci
Copy link
Copy Markdown
Contributor

Result of foundationdb-pr-macos-m1 on macOS Ventura 13.x

  • Commit ID: 77f46b9
  • Duration 0:35:25
  • Result: ✅ SUCCEEDED
  • Error: N/A
  • Build Log terminal output (available for 30 days)
  • Build Workspace zip file of the working directory (available for 30 days)

@foundationdb-ci
Copy link
Copy Markdown
Contributor

Result of foundationdb-pr-macos on macOS Ventura 13.x

  • Commit ID: 77f46b9
  • Duration 0:39:12
  • Result: ❌ FAILED
  • Error: Error while executing command: ssh -o StrictHostKeyChecking=no -o UserKnownHostsFile=/dev/null -i ${HOME}/.ssh_key ec2-user@${MAC_EC2_HOST} /usr/local/bin/bash --login -c ./build_pr_macos.sh. Reason: exit status 1
  • Build Log terminal output (available for 30 days)
  • Build Workspace zip file of the working directory (available for 30 days)

@spraza spraza changed the title Move delay to dispatch loop v4 (experimental, do_not_merge) Move delay to dispatch loop v4 Mar 27, 2026
@spraza spraza closed this Apr 6, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants