Sprint 01 is open: ACT SO-101 Pick-and-Place #2
arcofdescent1
announced in
Announcements
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
Sprint 01 is open: ACT SO-101 Pick-and-Place.
Applications: September 8–18, 2026
Kickoff: September 21 at 10:00 America/Denver
Independent runs: September 21–October 4
Public results: October 8 at 10:00
Joint report: October 12
We will select three to five teams with materially different SO-101, SO-100, compatible-arm, or simulation configurations. At least two teams will operate physical hardware. Completed, failed, blocked, and unsafe-to-continue attempts all belong in the report.
Apply: https://github.com/arcofdescent1/knownrobot/issues/new?template=sprint-application.yml
Event brief: https://knownrobot.com/sprints
Calendar: https://knownrobot.com/reproduction-sprints.ics
Public sessions: https://meet.jit.si/KnownRobotSprint01
Use this discussion for public protocol questions, team introductions, and factual corrections. Do not post credentials, personal data, serial numbers, confidential facility details, or unsafe operational information.
All reactions