- Objective 1: Review current backend progress and align on architecture decisions
- Objective 2: Finalize the map/routing strategy (OpenStreetMap + OpenRouteService)
- Objective 3: Decide on media storage solution (Firebase vs AWS)
- Objective 4: Assign tasks and open GitHub issues for the upcoming sprint
-
Topic 1: Map & Routing Strategy. The team agreed to use OpenStreetMap for map data and OpenRouteService for route generation. For negative reports (inaccessible areas), OpenRouteService's "avoid polygons" feature will be used to reroute around problem zones. For positive reports (e.g. ramps, elevators), a waypoint insertion approach will be used — routing A → waypoint → B. An edge case was raised where an off-route waypoint could cause absurd detours; the team agreed to filter waypoints within a reasonable distance buffer of the original route. OpenStreetMap's accessibility data coverage in Turkey is sparse, so the team will rely primarily on their own user-submitted report data.
-
Topic 2: Backend — Authentication, User Model & Class Diagram. Authentication via Spring Security is partially implemented but not yet pushed, to avoid locking all endpoints behind auth prematurely. The class diagram was reviewed: Guest/Basic/Registered user separation was discussed, and it was concluded that a separate Guest class is unnecessary. DTOs are used in requests to avoid exposing full entity objects for security and performance reasons. A null pointer risk was identified on the Report's location field — a
@NotNullconstraint needs to be added. Cascade delete must also be added to the User → Report relationship. -
Topic 3: Infrastructure — Media Storage (Firebase vs AWS). The team discussed where to store uploaded media (images/videos). AWS free tier has limited RAM (~1 GB) and storage; Firebase was suggested by the course instructor as an alternative. Neither solution has been used by the team before — research was assigned. The general approach agreed upon: store media on the cloud service and keep only the URL in the database. The project only needs to run until June 9th , so free-tier limits are acceptable.
-
Topic 4: Database, Migrations & Docker Setup. A migration script will be created so all team members share the same initial database state with default seed users and known credentials. Docker is used to run PostgreSQL locally — Spring Boot requires Docker to be running first. A Postman collection was set up and shared for testing all endpoints. Unit tests were found to be missing from some branches and need to be reconciled.
| Action Item | Owner | Due Date |
|---|---|---|
| Implement User module (all user types, registration flow) | Alaaddin Eren Namlı | 30.03.2026 |
| Fix Report class — add @NotNull on location, add cascade delete | Alaaddin Eren Namlı | 30.03.2026 |
| Write database migration script (seed users with default credentials) | Efe Feyzi Mantaroğlu | 30.03.2026 |
| Research and implement map service with negative report avoidance | Burak Altunay | 30.03.2026 |
| Research Firebase vs AWS for media storage and share recommendation | Mücahit Şimşek | 30.03.2026 |
- OpenStreetMap's accessibility data for Turkey is limited — the app's own user reports will be the primary data source for accessibility information.
- Docker is being used to run PostgreSQL locally; a migration script with default seed data (e.g., test users) will be required for all team members to run the project.
- Self-hosting OSM graph data was considered but ruled out due to storage requirements (~100GB+ for full dataset).
Team Members
- Lab 1 Report (12/02/2026)
- Lab 2 Report (19/02/2026)
- Lab 3 Report (26/02/2026)
- Lab 4 Report (05/03/2026)
- Lab 5 Report (12/03/2026)
- Lab 6 Report (26/03/2026)
- Lab 7 Report (02/04/2026)
- Lab 8 Report (16/04/2026)
- Lab 9 Report (30/04/2026)
- Lab 10 Report (07/05/2026)
- Weekly Meeting 1 (17.02.2026)
- Weekly Meeting 2 (26.02.2026)
- Weekly Meeting 3 (08.03.2026)
- Weekly Meeting 4 (12.03.2026)
- Weekly Meeting 4 'Extra' (14.03.2026)
- Weekly Meeting 5 (22.03.2026)
- Weekly Meeting 6 (28.03.2026)
- Weekly Meeting 7 (03.04.2026)
- Weekly Meeting 8 (14.04.2026)
- Weekly Meeting 9 (22.04.2026)
- Weekly Meeting 10 (08.05.2026)
- Frontend Meeting 1 (22.03.2026)
- Backend Meeting 1 (22.03.2026)
- Frontend Meeting 2 (28.03.2026)
- Backend Meeting 2 (28.03.2026)
- Frontend Meeting 3 (03.04.2026)
- Backend Meeting 3 (03.04.2026)
- Backend Meeting 4 (22.04.2026)
- Meeting with Arda Arslan (17.02.2026)
- Meeting with Özlem Belir (25.02.2026)
- Meeting with Suzan Üsküdarlı (17.04.2026)
Mapcess