MVP Demo Plan
Alaaddin Eren Namlı edited this page Apr 8, 2026
·
11 revisions
Overview: We will demonstrate the complete life-cycle of our MVP—encompassing both routing and crowdsourced reporting—across both web and mobile platforms. The demo will highlight two key dynamic scenarios: generating routes while actively reporting new obstacles via mobile, and generating routes on the web while verifying positive accessibility features to optimize a path.
User Scenarios:
- Mobile Scenario (Obstacle Reporting): Ahmet, a new student, requests a route from his friend's house in Rumelihisarüstü to the Computer Engineering (CmpE) department. On route, he encounters a construction zone near the Pyramid in the North Campus. He uses the mobile app to report this obstacle.
- Web Scenario (Routing & Positive Verification): Mehmet, a wheelchair user, requests a route from the CmpE building to the North Campus exit. The system successfully generates a route that avoids the newly reported construction zone but requires a long detour behind the dining hall. Mehmet realizes there is an unverified ramp report near the main stairs that would shorten his trip. He verifies this report on the web app, and recalculates his route to utilize the newly accessible path.
- 0:00 - 1:30 (Efe): Introduction. Open the presentation. Define accessibility, emphasizing that it is for everyone, not just specific groups. Explain the project's purpose and its potential impact on daily life. Introduce the two core scenarios and hand over the presentation.
- 1:30 - 3:00 (Osman): Mobile Routing & Reporting. Authenticated as 'Ahmet' on the Mobile App. Generate a route from Rumelihisarüstü to the Computer Engineering department. Simulate following the route. Pause to explain spotting a construction zone on the left side of the North Campus Pyramid. Open the report module, drop a pin, and report the construction.
- 3:00 - 4:00 (All Team / Osman): Live Verification. The rest of the team (presenters, note-takers, tech crew) act as community users on their respective devices. They view Ahmet's new report, inspect it, and click "Agree." Show the map UI dynamically update as the report reaches the required threshold and becomes "Verified."
- 4:00 - 5:30 (Mücahit): Web Routing (Obstacle Avoidance). Switch to the Web App, authenticated as 'Mehmet' (a wheelchair user). Generate a route from the CmpE building to the North Campus exit. Highlight that the generated route successfully avoids the newly verified construction near the Pyramid. Point out that this "ramp-assisted" path takes a long detour behind the dining hall.
- 5:30 - 6:30 (Mücahit): Positive Verification & Route Optimization. Mehmet remembers there is actually a ramp near the stairs leading to the exit. Inspect the map near the stairs and identify an existing, unverified positive report for a ramp. Click "Agree" to verify it. Recalculate the route from CmpE to the exit. Demonstrate that the newly generated ramp-assisted route now efficiently passes over the newly verified ramp, saving time and distance.
-
6:30 - 7:30 (Efe): Wrap-up & Future Scope. Conclude the live demonstration. Transition to discussing future implementation plans to show the product's roadmap:
- Incentive System: Gamification via points, leaderboards, and badges.
- Maintenance ("Report Fix" Mechanism): A system to handle resolved issues. For example, if a reported pothole is later repaired by the municipality, users can mark the original report as "fixed" to clear the obstacle from the map.
- In-app Support: Enhanced accessibility features for the app interface itself.
- 7:30 - 8:00+ (Efe / All): Q&A. Open the floor for questions from the audience.
- User Roles: We will use 'Ahmet' (a standard mobile user account), 'Mehmet' (a web user account with accessibility routing preferences enabled), and multiple active accounts logged into the team's devices for live verification.
-
Pre-populated State:
- The map must not have the construction obstacle near the Pyramid at the start, allowing Ahmet to create it live.
- The map must have an unverified "positive report" (a pin indicating a ramp) with 4 agrees pre-placed near the North Campus stairs so Mehmet can discover and verify it.
- Burak Altunay - Timer
- Yeldos Urashev - Instructor Note Taker / Verification Team
- Mustafa Aytekin - Note Taker / Verification Team
- Osman Talha Çolakerol - Presenter #1 (Mobile UI - Ahmet)
- Efe Feyzi Mantaroğlu - Presenter #2 (Intro, Outro, & Moderator)
- Mücahit Şimşek - Presenter #3 (Web UI - Mehmet)
- Alaaddin Eren Namlı - Tech Support / Verification Team
- Mert Özüstün - Tech Support / Verification Team
- Verification Synchronization: The team must be highly coordinated during the 3:00 - 4:00 window. All team members must have the app open and ready to vote on the construction report the moment Ahmet submits it so the presentation does not stall.
- State Management: The transition from Ahmet's mobile screen to Mehmet's web screen must be seamless. Tech Team must ensure the web map is refreshed to reflect the newly verified construction before calculating Mehmet's initial route.
- Clear Distinction of Features: During the Wrap-up (6:30 mark), Efe must clearly distinguish between what was just built and demonstrated (the MVP) and what is planned for the future (Gamification, Report Fixes). Do not blend these concepts during the live demo portion.
Team Members
- Lab 1 Report (12/02/2026)
- Lab 2 Report (19/02/2026)
- Lab 3 Report (26/02/2026)
- Lab 4 Report (05/03/2026)
- Lab 5 Report (12/03/2026)
- Lab 6 Report (26/03/2026)
- Lab 7 Report (02/04/2026)
- Lab 8 Report (16/04/2026)
- Lab 9 Report (30/04/2026)
- Lab 10 Report (07/05/2026)
- Weekly Meeting 1 (17.02.2026)
- Weekly Meeting 2 (26.02.2026)
- Weekly Meeting 3 (08.03.2026)
- Weekly Meeting 4 (12.03.2026)
- Weekly Meeting 4 'Extra' (14.03.2026)
- Weekly Meeting 5 (22.03.2026)
- Weekly Meeting 6 (28.03.2026)
- Weekly Meeting 7 (03.04.2026)
- Weekly Meeting 8 (14.04.2026)
- Weekly Meeting 9 (22.04.2026)
- Weekly Meeting 10 (08.05.2026)
- Frontend Meeting 1 (22.03.2026)
- Backend Meeting 1 (22.03.2026)
- Frontend Meeting 2 (28.03.2026)
- Backend Meeting 2 (28.03.2026)
- Frontend Meeting 3 (03.04.2026)
- Backend Meeting 3 (03.04.2026)
- Backend Meeting 4 (22.04.2026)
- Meeting with Arda Arslan (17.02.2026)
- Meeting with Özlem Belir (25.02.2026)
- Meeting with Suzan Üsküdarlı (17.04.2026)
Mapcess