Final Reflections
Our meetings stayed online throughout the semester, but we became much better at using them effectively. Instead of cramming everything into one long meeting, we started doing short syncs after each feature was completed. Catching issues right after something was built, rather than weeks later, made a huge difference. Overall, the process felt far less chaotic compared to how we worked during MVP.
MVP showed us what happens when planning is not taken seriously enough. This time, we broke tasks into smaller pieces, assigned responsibilities earlier, and intentionally left some buffer time in the schedule. The final week before the milestone was spent testing and polishing the product instead of rushing to finish features, which honestly felt new for us.
During MVP, the mobile and web platforms had slowly drifted apart, with different wording, flows, and visual behavior for similar features. This time, both teams reviewed each other’s work before considering anything complete. As a result, the platforms now feel much more like a single product. The few remaining differences are intentional rather than accidental.
At MVP, manual testing mostly depended on whoever happened to find a bug. For the final milestone, nearly the entire team tested real user scenarios, including report creation, fix requests, voting, routing with personal preferences, and the muhtar dashboard. Automated testing coverage also improved significantly: backend tests increased from around 40 to 75 files, frontend from 9 to 28, and mobile from 16 to 39. Between the structured manual testing and the expanded automated coverage, we went into the demo feeling genuinely confident.
The feedback from MVP forced us to rethink some of our priorities. A few features we had invested time in were either postponed because customers made it clear they were not the most important parts of the product. Instead of resisting that feedback, we focused on getting the core flows — reporting, verification, and resolution — working really well. Looking back, that was definitely the right decision.
We prepared for the demo properly. Everyone knew which part they were responsible for, the full scenario was rehearsed, and we thought through possible questions in advance. The presentation ended up running smoothly, and we were not caught off guard during the demo.
Team Members
- Lab 1 Report (12/02/2026)
- Lab 2 Report (19/02/2026)
- Lab 3 Report (26/02/2026)
- Lab 4 Report (05/03/2026)
- Lab 5 Report (12/03/2026)
- Lab 6 Report (26/03/2026)
- Lab 7 Report (02/04/2026)
- Lab 8 Report (16/04/2026)
- Lab 9 Report (30/04/2026)
- Lab 10 Report (07/05/2026)
- Weekly Meeting 1 (17.02.2026)
- Weekly Meeting 2 (26.02.2026)
- Weekly Meeting 3 (08.03.2026)
- Weekly Meeting 4 (12.03.2026)
- Weekly Meeting 4 'Extra' (14.03.2026)
- Weekly Meeting 5 (22.03.2026)
- Weekly Meeting 6 (28.03.2026)
- Weekly Meeting 7 (03.04.2026)
- Weekly Meeting 8 (14.04.2026)
- Weekly Meeting 9 (22.04.2026)
- Weekly Meeting 10 (08.05.2026)
- Frontend Meeting 1 (22.03.2026)
- Backend Meeting 1 (22.03.2026)
- Frontend Meeting 2 (28.03.2026)
- Backend Meeting 2 (28.03.2026)
- Frontend Meeting 3 (03.04.2026)
- Backend Meeting 3 (03.04.2026)
- Backend Meeting 4 (22.04.2026)
- Meeting with Arda Arslan (17.02.2026)
- Meeting with Özlem Belir (25.02.2026)
- Meeting with Suzan Üsküdarlı (17.04.2026)
Mapcess