Skip to content

[Bug]: Embedded tasknotes include subtasks when they shouldn't #1786

@3zra47

Description

@3zra47

Bug Description

When I embed just one section of a TaskNote based on a heading within that note, it includes the subtasks box that is at the bottom of the embedded note even when the section I have embedded only includes the middle portion of the note. Sometimes it also includes the task box that goes at the top of the note too, but that is more inconsistent.

I have realized this is only an issue when I have the Block Link Plus plugin enabled. Even so, I would still like this to not be an issue when that plugin is enabled. I also reported this as an issue on the Block Link Plus github but given the unique nature of the TaskNotes pop ups, I imagine it may need to be addressed from your end @callumalpass

Image Image Image Image

Metadata

Metadata

Assignees

No one assigned

    Labels

    bugSomething isn't working

    Projects

    Status

    No status

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions